11.1
Clasification Society 2024 - Version 9.40
Statutory Documents - IMO Publications and Documents - Specifications and Manuals - Inert Gas Systems - 11 Instruction Manual(s) - 11.1

11.1

 A line drawing of the inert gas system showing the positions of the inert gas pipework from the boiler or gas generator uptakes to each cargo tank and slop tank; gas scrubber; scrubber cooling water pump and pipework up to the effluent discharge overboard; blowers including the suction and discharge valves; recirculation or other arrangements to stabilize the inert gas plant operation; fresh air inlets; automatic gas pressure regulating stop valve; deck water seal and water supply, heating and overflow arrangements; deck nonreturn stop valve; water traps in any supply, vent, drain and sensing pipework; cargo tank isolation arrangement; purge pipes/vents; pressure/vacuum valves on tanks; pressure/vacuum breakers on the inert gas main; permanent recorders and instruments and the take-off points for their use, arrangements for using portable instruments, complete and partial wash bulkheads, mast risers, mast riser isolating valves; high velocity vents; manual and remote controls.


Copyright 2022 Clasifications Register Group Limited, International Maritime Organization, International Labour Organization or Maritime and Coastguard Agency. All rights reserved. Clasifications Register Group Limited, its affiliates and subsidiaries and their respective officers, employees or agents are, individually and collectively, referred to in this clause as 'Clasifications Register'. Clasifications Register assumes no responsibility and shall not be liable to any person for any loss, damage or expense caused by reliance on the information or advice in this document or howsoever provided, unless that person has signed a contract with the relevant Clasifications Register entity for the provision of this information or advice and in that case any responsibility or liability is exclusively on the terms and conditions set out in that contract.