The annex below has been consolidated into The International Code on the Enhanced
Programme of Inspections during Surveys of Bulk Carriers and Oil Tankers, 2011 (2011 ESP
CODE)
Part A – Code on the Enhanced Programme of Inspections
during Surveys of Bulk Carriers Having Single-Side Skin Construction
1 Paragraph 1.3.3 is replaced by the following:
-
"1.3.3 Where the damage found on the structure mentioned in
paragraph 1.3.1 above is isolated and of a localized nature which does not affect
the ship's structural integrity (as for example a minor hole in a cross-deck
strip), consideration may be given by the surveyor to allow an appropriate
temporary repair to restore watertight or weathertight integrity after evaluation
of the surrounding structure and impose an associated condition or recommendation
with a specific time limit in order to complete the permanent repair and retain
the validity of the relevant statutory certification."
2 The text in paragraph 5.3.2.3 is replaced by the
following:
3 The following new paragraph 5.5 is added after the
existing paragraph 5.4:
-
"5.5 Rescue and emergency response equipment
-
If breathing apparatus and/or other equipment is used as
"Rescue and emergency response equipment" then the equipment should
be suitable for the configuration of the space being surveyed."
4 The existing paragraphs 5.5 and 5.6 are renumbered,
respectively.
5 In the table of contents, a new reference to paragraph
"5.5 Rescue and emergency response equipment" is added after reference to paragraph 5.4
and the existing reference to paragraph numbers 5.5 and 5.6 are renumbered
accordingly.
6 In the renumbered paragraph 5.6.7, the referenced
paragraph numbers 5.5.5 and 5.5.6 are replaced by 5.6.5 and 5.6.6.
7 The following new paragraph 6.1.3 is added after the
existing paragraph 6.1.2:
-
"6.1.3 For bulk carriers subject to SOLAS regulation II-1/3-10, the owner
should arrange the updating of the Ship Construction File (SCF) throughout
the ship's life whenever a modification of the documentation included
in the SCF has taken place. Documented procedures for updating the
SCF should be included within the Safety Management System."
8 The existing text under paragraph 6.3 is numbered as
paragraph 6.3.1 and the following new paragraph 6.3.2 is added at the end of paragraph
6.3:
-
"6.3.2 For bulk carriers subject to SOLAS regulation II-1/3-10, the Ship
Construction File (SCF), limited to the items to be retained on board,
should be available on board."
9 The existing text under paragraph 6.4 is numbered as
paragraph 6.4.1 and the following new paragraphs 6.4.2 and 6.4.3 are added at the end of
paragraph 6.4:
-
"6.4.2 For bulk carriers subject to SOLAS regulation II-1/3-10, on completion
of the survey, the surveyor should verify that the update of the Ship
Construction File (SCF) has been done whenever a modification of the
documentation included in the SCF has taken place.
-
6.4.3 For bulk carriers subject to SOLAS regulation II-1/3-10, on completion
of the survey, the surveyor should verify any addition and/or renewal
of materials used for the construction of the hull structure are documented
within the Ship Construction File list of materials."
Annex 7 - Condition evaluation report
10 The general particulars are replaced by the following:
-
"General particulars
-
Ship's name:
|
Administration/recognized organization identity number: Previous
Administration/recognized organization identity number(s): IMO
number:
|
- …"
Annex 14 - Procedural requirements for thickness measurement
11 Section 1 is replaced by the following:
-
1 General
- Thickness measurements required in the context of hull structural
surveys, if not carried out by the recognized organization acting on behalf of the
Administration, should be witnessed by a surveyor of the recognized organization. The
attendance of the surveyor should be recorded. This also applies to thickness
measurements taken during voyages."
Part B – Code on the Enhanced Programme of Inspections
during Surveys of Bulk Carriers Having Double-Side Skin Construction
12 Paragraph 1.3.3 is replaced by the following:
-
"1.3.3 Where the damage found on the structure mentioned in
paragraph 1.3.1 above is isolated and of a localized nature which does not affect
the ship's structural integrity (as for example a minor hole in a cross-deck
strip), consideration may be given by the surveyor to allow an appropriate
temporary repair to restore watertight or weathertight integrity after evaluation
of the surrounding structure and impose an associated condition or recommendation
with a specific time limit in order to complete the permanent repair and retain
the validity of the relevant statutory certification."
13 The text in paragraph 5.3.2.3 is replaced by the
following:
14 The following new paragraph 5.5 is added after the
existing paragraph 5.4:
-
"5.5 Rescue and emergency response equipment
-
If breathing apparatus and/or other equipment is used as
"Rescue and emergency response equipment" then the equipment should
be suitable for the configuration of the space being surveyed."
15 The existing paragraphs 5.5 and 5.6 are renumbered,
respectively.
16 In the table of contents, a new reference to paragraph
"5.5 Rescue and emergency response equipment" is added after reference to paragraph 5.4
and the existing reference to paragraph numbers 5.5 and 5.6 are renumbered
accordingly.
17 In the renumbered paragraph 5.6.7, the referenced
paragraph numbers 5.5.5 and 5.5.6 are replaced by 5.6.5 and 5.6.6.
18 The following new paragraph 6.1.3 is added after the
existing paragraph 6.1.2:
-
"6.1.3 For bulk carriers subject to SOLAS regulation II-1/3-10, the Owner
should arrange the updating of the Ship Construction File (SCF) throughout
the ship's life whenever a modification of the documentation included
in the SCF has taken place. Documented procedures for updating the
SCF should be included within the Safety Management System."
19 The existing text under paragraph 6.3 is numbered as
paragraph 6.3.1 and the following new paragraph 6.3.2 is added at the end of paragraph
6.3:
-
"6.3.2 For bulk carriers subject to SOLAS regulation II-1/3-10, the Ship
Construction File (SCF), limited to the items to be retained on board,
should be available on board."
20 The existing text under paragraph 6.4 is numbered as
paragraph 6.4.1 and the following new paragraphs 6.4.2 and 6.4.3 are added at the end of
paragraph 6.4:
-
"6.4.2 For bulk carriers subject to SOLAS regulation II-1/3-10, on completion
of the survey, the surveyor should verify that the update of the Ship
Construction File (SCF) has been done whenever a modification of the
documentation included in the SCF has taken place.
-
6.4.3 For bulk carriers subject to SOLAS regulation II-1/3-10, on completion
of the survey, the surveyor should verify any addition and/or renewal
of materials used for the construction of the hull structure are documented
within the Ship Construction File list of materials."
Annex 7 - Condition evaluation report
21 The general particulars are replaced by the following:
-
"General particulars
-
Ship's name:
|
Administration/recognized organization identity number: Previous
Administration/recognized organization identity number(s): IMO
number:
|
- …"
Annex 12 - Procedural requirements for thickness measurement
22 Section 1 is replaced by the following:
-
1 General
- Thickness measurements required in the context of hull structural
surveys, if not carried out by the recognized organization acting on behalf of the
Administration, should be witnessed by a surveyor of the recognized organization. The
attendance of the surveyor should be recorded. This also applies to thickness
measurements taken during voyages."