This document has been consolidated into Ballast Water
Management Convention
Regulation E-1
Surveys
1 Paragraph 1.1 is replaced by the following:
".1 An initial survey before the ship is put in service or before the Certificate
required under regulation E-2 or E-3 is issued for the first time. This survey shall
verify that the ballast water management plan required by regulation B-1 and any
associated structure, equipment, systems, fitting, arrangements and material or
processes comply fully with the requirements of this Convention. This survey shall
confirm that a commissioning test has been conducted to validate the installation of any
ballast water management system by demonstrating that its mechanical, physical, chemical
and biological processes are working properly, taking into account the guidelines
developed by the Organization.footnote"
2 Paragraph 1.5 is replaced by the following:
".5 An additional survey, either general or partial, according to the circumstances,
shall be made after a change, replacement, or significant repair of the structure,
equipment, systems, fittings, arrangements and material necessary to achieve full
compliance with this Convention. The survey shall be such as to ensure that any such
change, replacement or significant repair has been effectively made, so that the ship
complies with the requirements of this Convention. When an additional survey is
undertaken for the installation of any ballast water management system, this survey
shall confirm that a commissioning test has been conducted to validate the installation
of the system by demonstrating that its mechanical, physical, chemical and biological
processes are working properly, taking into account the guidelines developed by the
Organization.footnote"
Appendix I
Form of International Ballast Water Management Certificate
3 The footnote of "IMO Number" under the item "Particulars of ship" is replaced by the
following:
4 The text under the title "Details of ballast water management method(s) used" is
replaced by the following: