3.1 If any clean ballast is to be discharged overboard
the pumps and piping serving the dedicated clean ballast tanks are
to be flushed into the slop tanks.
3.2 The valves to the slop tanks are to be closed
before pumping clean ballast overboard.
3.3 The valves to the dedicated clean ballast
tanks are to be closed after discharging ballast.
3.4 During the loaded passage the dedicated clean
ballast tanks must be periodically checked for any hydrocarbon gas
content and if any gas is detected the tank shall be ventilated until
safe for entry and inspected for leakage in bulkheads and piping.