1 INTRODUCTION
1.1 Regulation 27 of MARPOL Annex VI establishes the IMO
Ship Fuel Oil Consumption Database, to be administered by the
Organization, to which each Administrations will submit relevant
data for their registered ships of 5,000 gross tonnage (GT) and
above. Regulation 27.7 specifies that "the
data shall be verified according to procedures established by the
Administration, taking into account guidelines developed by the
Organization".
1.2 Regulation 28 of MARPOL Annex VI establishes the
operational carbon intensity rating mechanism. Regulation 28.6 specifies that the
attained annual operational CII shall be documented and verified
against the required annual operational CII to determine operational
carbon intensity rating A, B, C, D or E, either by the
Administration or by any organization duly authorized by it, taking
into account the guidelines developed by the Organization.
1.3 This document contains the Guidelines referred to in regulations
27.7 and 28.6 and is intended to assist
Administrations in developing their own verification programme.
1.4 A verification procedure should ensure the reliability of the
collected data and the correctness of the attained annual
operational CII, while minimizing the costs and associated burdens
to the ship and the Administration.
2 DEFINITIONS
For the purpose of these Guidelines, the definitions in MARPOL Annex VI apply.
3 RESPONSIBILITIES
3.1 The responsibilities of Administrations and ships are set out in
MARPOL Annex VI. These Guidelines do not change those or
create any new obligations.
3.2 Under the data collection system for fuel oil consumption and the
operational carbon intensity rating of ships, as specified in MARPOL
Annex VI, an Administration may authorize an
organizationfootnote to receive the data from a ship,
verify the data for compliance with the requirements, verify the
attained annual operational CII against the required annual
operational CII, determine the operational carbon intensity rating,
issue the Statement of Compliance, and submit the data to the
Organization. In every case, the Administration assumes full
responsibility for all tasks conducted by the Administration or any
organization duly authorized by it (hereinafter referred to as "the
Administration").
4 VERIFICATION OF THE REPORTED DATA
4.1 To facilitate data verification, the Administration should indicate
what additional documentation a ship should submit along with its
annual data report. Specification of this documentation can be done
on a ship basis, as part of the assessment of the Data Collection
Plan,footnote or it may be done as a general
policy statement or through such other policy instruments as the
Administration deems appropriate. Additional documentation to
facilitate data verification may include the following, as well as
other documentation that the Administration deems relevant:
-
.1 a copy of the verified ship's Data Collection Plan
(SEEMP Part II);
-
.2 summaries of bunker delivery notes (BDNs), in
sufficient detail to show that all fuel oil consumed
by the ship is accounted for (see sample form of BDN
summary set out in appendix 1);
-
.3 summaries of disaggregated data of fuel oil
consumption, distance travelled and hours under way,
in a format specified by the Administration (see
sample form of data summary set out in appendix 2);
-
.4 information to demonstrate that the ship followed the
Data Collection Plan set out in its SEEMP, including
information on data gaps and how they were filled as
well as how the event that caused the data gap was
resolved;
-
.5 copies of documents containing information on the
amount of fuel oil consumption, distance travelled
and hours under way for the ship's voyages during
the reporting period (e.g. the ship's official
logbook, oil record book, BDNs,
arrival/noon/departure reports, and from auto-log
data files); and
-
.6 supported by documentary evidence, copies of the fuel
oil mass to CO2 mass conversion factor
provided by fuel supplier in case the type of fuel
is not covered by the guidelines developed by the
Organization.footnote
4.2 In addition to the documentation described in paragraph 4.1, the
Administration may request a ship to submit such documentation
needed to perform a comprehensive review of a ship's annual fuel oil
consumption, distance travelled, and hours under way. The
Administration may request that this documentation be submitted by
all ships or a subset of the ships under its jurisdiction. This
documentation may be used by the Administration to verify whether
the ship followed the methodology specified in its Data Collection
Plan, with a view to confirming:
-
.1 consistency of reported data and calculated values,
including with previous reporting periods (if
applicable), through recalculating the annual
reported values using the underlying data, etc.;
-
.2 completeness of data (e.g. perform substantive testing
based on reconciliation, recalculations, and
document cross-check, for example with official
logbook and/or arrival/noon/departure reports,
auto-log report files; recalculate total quantities
of fuel oil used, distance travelled and hours under
way); and
-
.3 reliability and accuracy of the data (e.g. test that
the data quality procedures as described in the Data
Collection Plan have been properly implemented,
carry out site visits (typically to the company's
offices rather than to the ship) to test the
systems, processes and the control activities)
through corroborating fuel oil consumption data with
distance travelled and hours under way, comparing
reported fuel oil consumption with that which is
expected for the ship size, operational profile, and
technical characteristics, and/or comparing reported
fuel oil consumption total fuel bunkered, etc.
4.3 For a ship which has undergone a transfer addressed in regulations
27.4, 27.5 or 27.6 of MARPOL Annex VI, the losing
Administration needs to verify the data before the transfer.
5 VERIFICATION OF THE ATTAINED ANNUAL OPERATIONAL CII AND
DETERMINATION OF THE CII RATING
5.1 To facilitate the verification of the attained annual operational
CII, the Administration should indicate what additional
documentation a ship should submit along with its annual data
report. Additional documentation to facilitate the verification may
include the following, as well as other documentation that the
Administration deems relevant:
-
.1 a copy of the verified ship's Operational Carbon
Intensity Plan (SEEMP part III);
-
.2 documents (IEE certificate, Stability Booklet or
International Tonnage Certificate) evidencing the
capacity parameter of the ship in the metric
relevant for the calculation of its operational
carbon intensity (deadweight or gross tonnage);
-
.3 aggregated data of fuel oil consumption and distance
travelled covering the entire calendar year to
calculate the attained annual operational CII (AER
or cgDIST) (see sample form of data summary set out
in appendix 2);
-
.4 the aggregated values of the parameters and associated
calculation methods to determine the annual metric
value of the trial CIIs on voluntary basis, if any
(see sample form of data summary set out in appendix
2 –Add.1);
-
.5 supported by documentary evidence, the correction
factors and voyage adjustmentsfootnote applied in the attained
annual operational CII calculation, if any, during
the reporting period (see sample form of data
summary set out in appendix 2); and
-
.6 statements of compliance for previous two calendar
years where applicable.
5.2 The attained annual operational CII should be verified using the data
over a 12-month period from 1 January to 31 December for the
preceding calendar year, by the Administration. In cases where the
calculation of the attained annual operational CII is not possible
due to the unavailability of some data, such as where a new ship is
delivered after 1 January in the preceding year, the attained annual
operational CII should be verified using the available data covering
the corresponding period of the preceding calendar year.
5.3 In case of a ship with multiple load line certificates or with a load
line certificate containing multiple load lines, the highest
deadweight value should be used to calculate and verify the required
and attained annual operational CII.
5.4 For a ship which permanently changes its deadweight (DWT) and/or its
gross tonnage (GT) during the year, which the SEEMP or a corrective
action plan identifies as being undertaken to improve the ship's
operational carbon intensity performance:
-
.1 the required annual operational CII should always be
calculated and verified using the original DWT or GT
value before conversion; however, the attained CII
which is used to assess compliance should be
calculated and verified using the new DWT or GT
value after conversion; and
-
.2 for the year when the conversion is made, the attained
annual operational CII should be calculated and
verified for the entire calendar year on the average
DWT or GT value weighted on distance travelled
before and after conversion.
5.5 Except for those specified in 5.4, for a ship which is regarded by
the Administration as a newly constructed ship as per regulation 5.4.3 of MARPOL Annex VI due
to major conversion, including extensive changes of carrying
capacity and/or ship type during the year, the required and attained
annual operational CII should be calculated and verified as per a
newly constructed ship for the period after conversion. For the year
when the major conversion is made, the data for partial year before
conversion should still be reported for verification but will not be
included in the calculation and verification of the attained annual
operational CII.
5.6 For a ship which has undergone a transfer addressed in regulations
27.4, 27.5 or 27.6 of MARPOL Annex VI, the losing
Administration neither needs to verify the attained annual
operational CII nor to determine the annual CII rating of the ship
for partial year. The attained annual operational CII should be
verified by the receiving Administration using the data over an
entire calendar year. In such cases, the aggregated data necessary
to calculate the attained annual operational CII before transfer,
which should have already been verified by the losing
Administration, can be directly used by the receiving Administration
without further verification (see sample form set out in appendix 3
and appendix 3 – Add.1).
5.7 The administration should determine the operational carbon intensity
rating for the ship, taking into account the guidelines developed by
the Organization.footnote The attained and required annual
operational CII, as well as the rating boundaries, should be all
given with three decimal places. If the attained annual operational
CII happens to land on a rating boundary, the ship should be rated
as the better of the two ratings.
5.8 The trial CIIs (e.g. EEPI, cbDIST, clDIST or EEOI),footnote if voluntarily calculated and
reported, should be verified by the Administration following the
same procedure as for the attained annual operational CII (AER or
cgDIST). The Administration does not need to assign a rating to a
ship based on trial CIIs.
6 ISSUE OF A STATEMENT OF COMPLIANCE
6.1 In accordance with regulation 6.6 of MARPOL Annex VI, upon receipt of
reported data pursuant to regulation 27 of MARPOL Annex VI and
attained annual operational CII pursuant to regulation 28 of MARPOL Annex VI and
satisfactory completion of the verification, the Statement of
Compliance should be issued by the Administration.
6.2 Notwithstanding paragraph 6.1, the Administration should consider
whether a corrective action plan is required according to regulation 6.8 of MARPOL Annex VI. In
the case of a corrective actions plan being required but not
submitted together with the attained annual operational CII, the
administration should inform the company in a timely manner that a
revised SEEMP including a plan of corrective actions, must be
submitted for verification no later than one month after reporting
the attained annual operational CII. The Statement of Compliance
should not be issued in such a case unless a corrective action plan
is duly developed and reflected in the SEEMP and verified by the
Administration, taking into account the guidelines developed by the
Organization.footnote
6.3 Should any material discrepancy be identified by the Administration
in the reported data and/or the calculation of required/attained
annual operational CII, it should be communicated to the company on
a timely basis for clarification or correction. A discrepancy is
considered material if the discrepancy or aggregation of
discrepancies could influence the reported total by more than ±5%.
The Statement of Compliance should not be issued in such a case
unless the material discrepancy is clarified or corrected.
APPENDIX 1 - SAMPLE OF THE BDN SUMMARIES
Date of Operations
|
Fuel
Oil Type/Mass(MT)
|
Descriptions
|
(dd/mm/yyyy)
|
DO/GO
|
LFO
|
HFO
|
LPG(P)
|
LPG(B)
|
LNG
|
Methanol
|
Ethanol
|
Others(CF)
|
① BDN
|
09/01/2023
|
|
|
|
|
|
|
|
|
|
|
02/05/2023
|
|
|
150
|
|
|
|
|
|
|
|
08/07/2023
|
|
|
|
|
|
|
|
|
|
|
09/10/2023
|
|
|
|
|
|
|
|
|
|
|
10/12/2023
|
|
|
300
|
|
|
|
|
|
|
|
①Annual Supply Amount
|
0
|
0
|
450
|
0
|
0
|
0
|
0
|
0
|
0
|
|
② Correction
for the tank oil remainings
|
01/01/2023
|
|
|
400
|
|
|
|
|
|
|
|
31/12/2023
|
|
|
200
|
|
|
|
|
|
|
|
②Correction for the tank oil
remaining
|
0
|
0
|
200
|
0
|
0
|
0
|
0
|
0
|
0
|
The difference in the amount of the
remaining tank oil at the beginning/end of the
data collection period.
|
③ Other
corrections
|
30/03/2023
|
|
|
|
|
|
|
|
|
|
|
15/09/2023
|
|
|
|
|
|
|
|
|
|
|
31/12/2023
|
|
|
|
|
|
|
|
|
|
|
③Annual other corrections
|
0
|
0
|
0
|
0
|
0
|
0
|
0
|
0
|
0
|
|
Annual Fuel
Consumption
|
Annual Fuel Consumption
(①+②+③)
|
0
|
0
|
650
|
0
|
0
|
0
|
0
|
0
|
0
|
|
Explanatory
remarks;
If bunker supply/correction
data have been recorded in a Company’s electronic
reporting system, the data is acceptable to be
submitted in the existing format instead of
submitting the data by this format.
|
APPENDIX 2 - SAMPLE OF THE COLLECTED DATA SUMMARIES
Date and
time from
|
footnoteDate and time to
|
Distance
travelled
|
Hours under
way
|
footnoteexceptional conditions
specified in regulation 3.1 of MARPOL
Annex VI
|
footnoteSailing in ice
condition
|
footnoteSTS Operation
|
Fuel consumption (metric
tons)
|
total mass
|
footnotemass to be deducted from
the total
|
consumed for
production of electrical
power(𝑭𝑪𝒆𝒍𝒆𝒄𝒕𝒓𝒊𝒄𝒂𝒍)
|
consumed by
oil-fired boiler for cargo heating/discharge on
tankers
(𝑭𝑪𝒃𝒐𝒊𝒍𝒆𝒓)
|
consumed
by standalone engine driven cargo pumps during
discharge operations on tankers
(𝑭𝑪𝒐𝒕𝒉𝒆𝒓𝒔)
|
(dd/mm/ yyyy; hh:mm
UTC)
|
(dd/mm/ yyyy; hh:mm
UTC)
|
(n.m)
|
(hh:mm)
|
(Y/N)
|
(Y/N)
|
(Y/N)
|
footnoteDO/GO
|
...
|
DO/GO
|
...
|
DO/GO
|
...
|
DO/GO
|
...
|
01/01/2023 00:00
|
01/01/2023 13:20
|
150
|
13:20
|
N
|
N
|
N
|
|
|
|
|
|
|
|
|
01/01/2023 13:20
|
01/01/2023 24:00
|
60
|
10:40
|
N
|
Y
|
N
|
|
|
|
|
|
|
|
|
02/01/2023 00:00
|
02/01/2023 24:00
|
288
|
24:00
|
N
|
N
|
Y
|
|
|
|
|
|
|
|
|
03/01/2023 00:00
|
03/01/2023 24:00
|
260
|
24:00
|
N
|
N
|
Y
|
|
|
|
|
|
|
|
|
……
|
……
|
……
|
……
|
……
|
……
|
……
|
|
|
|
|
|
|
|
|
……
|
……
|
……
|
……
|
……
|
……
|
……
|
|
|
|
|
|
|
|
|
31/12/2023 00:00
|
31/12/2023 24:00
|
290
|
24:00
|
N
|
N
|
N
|
|
|
|
|
|
|
|
|
Annual total
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Explanatory remarks: If bunker supply/correction data have
been recorded in a company's electronic reporting system, the data
is acceptable to be submitted in the existing format instead of
submitting the data by this format.
APPENDIX 2 – ADD.1 - SAMPLE OF THE COLLECTED DATA SUMMARIES TO
CALCULATE TRIAL CII ON A VOLUNTARY BASIS
The following aggregated data should be additionally included in the
table in appendix 2, if one or more trial CII metrics have been
applied on a voluntary basis:
Date from (dd/mm/yyyy)
|
footnoteDate to
(dd/mm/yyyy)
|
Laden distance travelled (n.m)
|
footnoteTransport work (metric of
transport work)
|
01/01/2023
|
|
|
|
02/01/2023
|
|
|
|
03/01/2023
|
|
|
|
|
|
|
|
|
|
|
|
31/12/2023
|
|
|
|
Annual
total
|
|
|
Explanatory remarks: If bunker supply/correction data have been recorded
in a Company's electronic reporting system, the data is acceptable
to be submitted in the existing format instead of submitting the
data by this format.
APPENDIX 3 - SAMPLE OF THE AGGREGATED DATA BEFORE A TRANSFER OF
FLAG/COMPANY ADDRESSED IN REGULATIONS 27.4, 27.5 OR 27.6 OF MARPOL
ANNEX VI
Date of
transfer (dd/mm/yyyy)
|
Type of
transfer (flag/company/both)
|
Reporting period
|
Distance Travelled (n.m)
|
Hours under way (hh:mm)
|
Fuel consumption (metric
tons)
|
total mass
|
footnotemass to be deducted from
the total
|
footnotemass consumed in STS
operations
|
|
|
Date from
(dd/mm/yyyy)
|
Date to
(dd/mm/yyyy)
|
Total distance
travelled
|
footnotedistance to be deducted
from CII calculation
|
|
footnoteDO/GO
|
...
|
DO/GO
|
...
|
DO/GO
|
...
|
12/05/2023
|
Flag
|
01/01/2023
|
11/05/2023
|
|
|
|
|
|
|
|
|
|
15/06/2023
|
Company
|
12/05/2023
|
14/06/2023
|
|
|
|
|
|
|
|
|
|
02/11/2023
|
Both
|
15/06/2023
|
01/11/2023
|
|
|
|
|
|
|
|
|
|
……
|
|
|
|
|
|
|
|
|
|
|
|
|
APPENDIX 3 – ADD.1 - SAMPLE OF THE AGGREGATED DATA BEFORE A TRANSFER
OF FLAG/COMPANY ADDRESSED IN REGULATIONS 27.4, 27.5 OR 27.6 OF
MARPOL ANNEX VI TO CALCULATE TRIAL CII METRICS ON A VOLUNTARY
BASIS
The following aggregated data may be additionally included in the table
in appendix 3, if one or more trial CII metrics have been applied on
a voluntary basis:
Date of
transfer (dd/mm/yyyy)
|
Type of
transfer (flag/company/both)
|
Reporting period
|
Laden dstance travelled (n.m)
|
footnoteTransport work (metric of
transport work)
|
Date from
(dd/mm/yyyy)
|
Date to
(dd/mm/yyyy)
|
12/05/2023
|
Flag
|
01/01/2023
|
11/05/2023
|
|
|
15/06/2023
|
Company
|
12/05/2023
|
14/06/2023
|
|
|
02/11/2023
|
Both
|
15/06/2023
|
01/11/2023
|
|
|
……
|
|
|
|
|
|