3.1 The initial survey referred to in Regulation
4 (now Regulation 6) of Annex
I of MARPOL 73/78 shall include the verifications of the appropriateness
of:
-
.1 the selection of ballast tanks and pumping
and piping arrangements; and
-
.2 the CBT Operation Manual, i.e. detailed operational
procedures including checklist.
3.2 The International Oil Pollution Prevention
Certificate shall indicate which tanks are designated as dedicated
clean ballast tanks. It shall also state that the master has been
supplied with information concerning approved operational procedures
(CBT Operation Manual).