3 Launching operation
Clasification Society 2024 - Version 9.40
Statutory Documents - IMO Publications and Documents - Circulars - Maritime Safety Committee - MSC.1/Circular.1205/Rev.1 - Revised Guidelines for Developing Operation and Maintenance Manuals for Lifeboat Systems - (26 June 2019) - Appendix - Example Operation and Maintenance Manual for a Lifeboat System1 - 3 Launching operation

3 Launching operation

3.1 Preparation before launching

No. Operation Guide Schematic Diagram
1 Prepare transceivers, and confirm the communication condition.

<Activity on the ship>



2 <In case of drill>

Connect the push-button switch for recovering to the receptacle.

<Activity on the ship>



3 <In case of drill>

Turn on the power switch of start panel.



<Activity on the ship>



4 Don life jackets.

<Activity on the ship>



3.2 Setting of painter

No. Operation Guide Schematic Diagram
1 Confirm the connection of the painter on the painter release device of the lifeboat.

<Activity on the lifeboat>



2 Confirm the connection of the painter as far forward as practicable inboard of the falls but outboard of everything else.

<Activity on the ship>





3.3 Release of safety pin (if fitted) for winch hand brake lever



No. Operation Guide Schematic Diagram
1 Pull out the safety pin (if fitted).

<Activity on the ship>



3.4 Release of davit arm stopper

Go up to the platform of the davit system (platform for boarding the lifeboat).

No. Operation Guide Schematic Diagram
1 Wind the boat fall manually to take off the slack. Pull out the safety pin of the davit arm stop, if fitted.

<Activity on the ship>

Note: Safety pins are generally intended only for use during maintenance or in port.



2 Release the davit arm stop by operating the handle.

<Activity on the ship>





3.5 Boarding the lifeboat

No. Operation Guide Schematic Diagram
1 Confirm that the remote control wire is drawn into the lifeboat.

<Activity on the ship>



2 Open the lifeboat boarding door and board the lifeboat.

<Activity on the ship> and <Activity in the lifeboat>



3 Ensure the bottom plug is fitted and tight.

<Activity in the lifeboat>



4 Turn on the power supply switch.

<Activity in the lifeboat>



5 Open the fuel oil valve.

<Activity in the lifeboat>



6 Confirm that the cooling seawater valve is open.

<Activity in the lifeboat>



7 Close the drain valve on exhaust pipe.

<Activity in the lifeboat>



8 Fasten seatbelt.

<Activity in the lifeboat>







3.6 Launching procedure

No. Operation Guide Schematic Diagram
1 Confirm that all crew boarded in the lifeboat are seated and their seatbelts are fastened.

<Activity in the lifeboat>



2 Start engine.

<Activity in the lifeboat>



3 Pull down the winch remote control wire.

<Activity in the lifeboat>









3.7 Release gear operation

3.7.1 Releasing procedure

A flow chart of the off-load and on-load releasing procedures is shown in the following figure.



3.7.2 Off-load release

This operation is the normal method of launch and release and is conducted when the lifeboat is fully waterborne.


No. Operation Guide Schematic Diagram
1 Confirm that the lifeboat is waterborne.

<Activity in the lifeboat>



2 Pull out the release handle safety pin.

<Activity in the lifeboat>



3 Pull the release handle to the fully open position by one action.

<Activity in the lifeboat>



No. Operation Guide Schematic Diagram




3.7.3 On-load release

This operation is conducted when the lifeboat is not fully waterborne.




No. Operation Guide Schematic Diagram
1 Confirm that the lifeboat is as close as possible to the water surface, but that the hydrostatic interlock is not triggered.

<Activity in the lifeboat>



2 Pull out the release handle safety pin.

<Activity in the lifeboat>



3 Open the hydrostatic interlock cover.

<Activity in the lifeboat>



4 Lift the hydrostatic interlock lever fully and hold it.

<Activity in the lifeboat>



5 Pull the release handle to the fully open position by one action.

<Activity in the lifeboat>



3.8 Painter release and lifeboat operation

No. Operation Guide Schematic Diagram
1 Release the painter.

<Activity in the lifeboat>



2 Lifeboat operation

Ahead, astern, turning, spray, lighting of interior light and canopy light, and other performances.

<Activity in the lifeboat>

 



Copyright 2022 Clasifications Register Group Limited, International Maritime Organization, International Labour Organization or Maritime and Coastguard Agency. All rights reserved. Clasifications Register Group Limited, its affiliates and subsidiaries and their respective officers, employees or agents are, individually and collectively, referred to in this clause as 'Clasifications Register'. Clasifications Register assumes no responsibility and shall not be liable to any person for any loss, damage or expense caused by reliance on the information or advice in this document or howsoever provided, unless that person has signed a contract with the relevant Clasifications Register entity for the provision of this information or advice and in that case any responsibility or liability is exclusively on the terms and conditions set out in that contract.