Statutory Documents - IMO Publications and Documents - Specifications and Manuals - Dedicated Clean Ballast Tanks - Annex 1 - Revised Specifications for Oil Tankers with Dedicated Clean Ballast Tanks - Appendix 1 - Dedicated Clean Ballast Tank Operation Procedures - 1 Prior to arrival at the loading port

1 Prior to arrival at the loading port

  1.1 The pumping and piping designated for clean ballast operation shall be properly cleaned to permit the discharge of clean ballast in the loading port.

  1.2 The valves to the slop tanks and the cargo tanks which are connected to the clean ballast system shall be closed.

  1.3 An inspection of all CBT ballast is to be made to ensure that there is no contamination with oil.

  1.4 Clean ballast shall be discharged until sufficient quantity remains for safe berthing and for flushing lines if necessary.

  1.5 If no further ballast discharge is anticipated in the loading port all valves to the dedicated clean ballast tanks shall be shut and the clean ballast piping drained.


Copyright 2022 Clasifications Register Group Limited, International Maritime Organization, International Labour Organization or Maritime and Coastguard Agency. All rights reserved. Clasifications Register Group Limited, its affiliates and subsidiaries and their respective officers, employees or agents are, individually and collectively, referred to in this clause as 'Clasifications Register'. Clasifications Register assumes no responsibility and shall not be liable to any person for any loss, damage or expense caused by reliance on the information or advice in this document or howsoever provided, unless that person has signed a contract with the relevant Clasifications Register entity for the provision of this information or advice and in that case any responsibility or liability is exclusively on the terms and conditions set out in that contract.