ANNEX A
CODE ON THE ENHANCED PROGRAMME OF INSPECTIONS DURING SURVEYS OF BULK
CARRIERS
Part A
CODE ON THE ENHANCED PROGRAMME OF INSPECTIONS DURING SURVEYS OF BULK CARRIERS
HAVING SINGLE-SIDE SKIN CONSTRUCTION
1 Paragraph 1.5 is replaced with the following:
-
"1.5 Thickness measurements and close-up surveys
-
In any kind of survey, i.e. renewal, intermediate, annual or other surveys
having the scope of the foregoing ones, for structures in areas where
close-up surveys are required, thickness measurements, when required by
annex 2, should be carried out simultaneously with close-up surveys."
2 Paragraph 2.4.4 is replaced with the following:
ANNEX 1
REQUIREMENTS FOR CLOSE-UP SURVEY AT RENEWAL SURVEYS
3 Note (D) is replaced with the following:
Part B
CODE ON THE ENHANCED PROGRAMME OF INSPECTIONS DURING SURVEYS OF BULK CARRIERS
HAVING DOUBLE-SIDE SKIN CONSTRUCTION
4 Paragraph 1.5 is replaced with the following:
-
"1.5 Thickness measurements and close-up surveys
-
In any kind of survey, i.e. renewal, intermediate, annual or other surveys
having the scope of the foregoing ones, for structures in areas where
close-up surveys are required, thickness measurements, when required by
annex 2, should be carried out simultaneously with close-up surveys."
5 Paragraph 2.4.4 is replaced with the following:
ANNEX 1
REQUIREMENTS FOR CLOSE-UP SURVEY AT RENEWAL SURVEYS
Appendix 1 – Minimum requirements for close-up survey at renewal
survey of double-side skin bulk carriers excluding ore carriers
5 < Age ≤ 10 years – Renewal Survey No.2
6 The third paragraph in the column is replaced with the following:
10 < Age ≤ 15 years – Renewal Survey No.3
7 The third paragraph in the column is replaced with the following:
Age > 15 years – Renewal Survey No.4 and Subsequent
8 The third paragraph in the column is replaced with the following:
9 Note (D) is replaced with the following:
Appendix 2 – Minimum requirements for close-up survey at renewal survey for ore
carriers
10 Note (D) is replaced with the following:
ANNEX 2
REQUIREMENTS FOR THICKNESS MEASUREMENTS AT RENEWAL SURVEYS
5 < Age ≤ 10 years – Renewal Survey No.2
11 Paragraph 3 is replaced with the following:
10 < Age ≤ 15 years – Renewal Survey No.3
12 Paragraph 3 is replaced with the following:
ANNEX B
CODE ON THE ENHANCED PROGRAMME OF INSPECTIONS DURING SURVEYS OF OIL
TANKERS
Part A
CODE ON THE ENHANCED PROGRAMME OF INSPECTIONS DURING SURVEYS OF DOUBLE-HULL OIL
TANKERS
13 Paragraph 1.5 is replaced with the following:
-
"1.5 Thickness measurements and close-up surveys
-
In any kind of survey, i.e. renewal, intermediate, annual or other surveys
having the scope of the foregoing ones, for structures in areas where
close-up surveys are required, thickness measurements, when required by
annex 2, should be carried out simultaneously with close-up surveys."
14 Paragraph 2.5.6 is replaced with the following:
-
"2.5.6 In cases where two or three sections are to be measured, at least one
should include a ballast tank within 0.5L amidships. In case of oil
tankers of 130 m in length and upwards (as defined in the International
Convention on Load Lines in force) and more than 10 years of age, for the
evaluation of the ship's longitudinal strength as required in 8.1.2, the
sampling method of thickness measurements is given in annex 12."
15 Paragraph 2.6.1.1 is replaced with the following:
-
".1 tank testing procedure, specifying fill heights, tanks being filled and
bulkheads being tested, has been submitted by the owner and reviewed by the
Administration or recognized organization prior to the testing being carried
out;"
ANNEX 1
MINIMUM REQUIREMENTS FOR CLOSE-UP SURVEY AT RENEWAL SURVEY OF DOUBLE-HULL OIL
TANKERS
16 Note (7) is replaced with the following:
-
"(7) Web frame in a cargo oil tank means deck transverse, longitudinal
bulkhead structural elements and cross ties, where fitted, including
adjacent structural members."
Part B
CODE ON THE ENHANCED PROGRAMME OF INSPECTIONS
DURING SURVEYS OF OIL TANKERS OTHER THAN
DOUBLE-HULL OIL TANKERS
17 Paragraph 1.5 is replaced with the following:
-
"1.5 Thickness measurements and close-up surveys
-
In any kind of survey, i.e. renewal, intermediate, annual or other surveys
having the scope of the foregoing ones, for structures in areas where
close-up surveys are required, thickness measurements, when required by
annex 2, should be carried out simultaneously with close-up surveys."
18 Paragraph 2.6.1.1 is replaced with the following:
-
".1 tank testing procedure, specifying fill heights, tanks being filled and
bulkheads being tested, has been submitted by the owner and reviewed by the
Administration or recognized organization prior to the testing being carried
out;"