12.1.1 The manufacturer’s works are to be approved in accordance with the requirements
specified in Materials and Qualification Procedures for Ships, Book A, Procedure
MQPS 0-4.
12.1.2 All manned chambers under internal and external pressure require the
following to be carried out;
- 100 per cent
radiography on all major welds. Welds not subjected to radiography shall be
examined by other approved non-destructive testing methods. The use of gamma
ray examination may be used only if specifically approved;
- in general,
‘tell-tale’ holes should not be drilled in compensating plates which will be
subjected to external pressure. Where ‘tell-tale’ holes have been drilled in
compensating plates, they are to be fitted with taper-screw plugs and seal
welded prior to the hydrostatic pressure test, and are to remain efficiently
plugged and sealed during service;
- post weld heat
treatment may be required. Each case will be considered individually based
on applicable Pressure Vessel code;
- diving bells/chambers
subject to external pressure are to be subjected to an external test
pressure of 1,3 times the maximum agreed working pressure when tested in
open water and to an external test pressure 1,4 times the maximum agreed
working pressure if tested in the test chamber. Test pressures other than
the foregoing will be given consideration;
- after hydrostatic
test, all pressure retaining welds and / or seal welds shall be examined in
accordance with the requirements for either magnetic particle examination or
liquid penetrant examination;
- intermediate heads
for the pressure chambers should be designed and attached using the adopted
national or international pressure vessel design code. In the case where the
intermediate heads' attachment are not covered by the adopted code, the
heads may be attached based on the guidance given in ASME PVHO-1. The basic
allowable stress will be as per the applicable design code/ standard;
- spherical shell and
spherical segment head shall be post weld heat treated irrespective of
thickness. Heat treatment of the formed heads and the testing of the formed
heads material will be considered individually;
- production tests will
be carried out in line with the requirements of the code being followed in
agreement with the attending Surveyor;
- the lifting block or
the reinforcement plate for attaching the lifting block on the top of the
diving bell are to have through thickness properties and be subject to
appropriate NDE (UT & MT). The attachment welds are to be subject to UT
& MT to Surveyor's satisfaction.