3.1.1 This subsection should contain a scaled
drawing showing the layout of cargo spaces, tanks, stores, machinery
spaces and crew/passenger accommodation. Cargo spaces and tanks should
be suitably identified by purpose, names and/or numbers consistent
with other information in this manual.
3.1.2 The above plan should, in addition, present:
-
.1 reference planes and the rise of keel, where
applicable;
-
.2 frames, frame spacing and numbering; and
-
.3 location of draught marks forward, mid and
aft.
3.1.3 The reference planes should preferably be
at the:
-
.1 aft perpendicular for the longitudinal coordinates;
-
.2 centre line for the transverse coordinates;
and
-
.3 base line for the vertical coordinates.
3.1.4 The above plan should, in addition, present
a diagram of the load line marks showing:
-
.1 position of the deck line relative to the ship;
-
.2 draught to the summer load waterline;
-
.3 draught to the summer timber load waterline;
-
.4 corresponding freeboards; and
-
.5 deadweight scale.