All decisions which are made for the purpose of applying
the requirements of regulations 19, 22,
24, 25, 27 and 28 and which affect bridge design, the design and arrangement
of navigational systems and equipment on the bridge and bridge proceduresfootnoteshall be taken with the aim of:
-
.1 facilitating the tasks to be performed by the
bridge team and the pilot in making full appraisal of the situation
and in navigating the ship safely under all operational conditions;
-
.2 promoting effective and safe bridge resource
management;
-
.3 enabling the bridge team and the pilot to have
convenient and continuous access to essential information which is
presented in a clear and unambiguous manner, using standardized symbols
and coding systems for controls and displays;
-
.4 indicating the operational status of automated
functions and integrated components, systems and/or sub-systems;
-
.5 allowing for expeditious, continuous and effective
information processing and decision-making by the bridge team and
the pilot;
-
.6 preventing or minimizing excessive or unnecessary
work and any conditions or distractions on the bridge which may cause
fatigue or interfere with the vigilance of the bridge team and the
pilot; and
-
.7 minimizing the risk of human error and detecting
such error if it occurs, through monitoring and alarm systems, in
time for the bridge team and the pilot to take appropriate action.