5.2.1 The master should advise the terminal representative
of any deviation from the deballasting plan or any other matter which
may affect cargo loading.
5.2.2 The ship should be kept upright or, if a
list is required for operational reasons, it should be kept as small
as possible.
5.2.3 The master should ensure close supervision
of the loading operation and of the ship during final stages of loading.
The master should advise the terminal representative when final trimming
of the ship has to commence in order to allow for the conveyor system
run-off.