| HIGH
PRESSURE CO2 SYSTEM
|
| Date:
|
Name of
ship/unit:
|
IMO
No.:
|
|
|
Technical description
|
| No.
|
Text
|
Value
|
| 1
|
Manufacturer
|
|
| 2
|
Number of main cylinders
|
|
| 3
|
Main cylinders capacity (each)
|
|
| 4
|
Number of pilot cylinders
|
|
| 5
|
Pilot cylinder capacity (each)
|
|
| 6
|
Number of distribution lines
|
|
| 7
|
Oldest cylinder pressure test date
|
|
| 8
|
Protected space(s)
|
|
| 9
|
Date flexible hoses fitted/renewed
|
|
|
Description of inspection/Tests
|
| No.
|
Description
|
Carried
out
|
Not
carried out
|
Not
applicable
|
Comment
|
| 1
|
Release controls and distribution valves secured to prevent
accidental discharge
|
|
|
|
|
| 2
|
Contents in main cylinders checked by weighing
|
|
|
|
|
| 3
|
Contents in main cylinders checked by liquid level
indicator
|
|
|
|
|
| 4
|
Contents of pilot cylinders checked
|
|
|
|
|
| 5
|
All cylinder valves visually inspected
|
|
|
|
|
| 6
|
All cylinder clamps and connections checked for tightness
|
|
|
|
|
| 7
|
Manifold visually inspected
|
|
|
|
|
| 8
|
Manifold tested for leakage, by applying dry working air
|
|
|
|
|
| 9
|
Main valve and distribution valves visually inspected
|
|
|
|
|
| 10
|
Main valve and distribution valves tested for operation
|
|
|
|
|
| 11
|
Time delay devices tested for correct settingfootnote
|
|
|
|
|
| 12
|
Remote release system visually inspected
|
|
|
|
|
| 13
|
Remote release system tested
|
|
|
|
|
| 14
|
Servo tubing/pilot lines pressure tested at maximum working
pressure and checked for leakages and blockage
|
|
|
|
|
| 15
|
Manual pull cables, pulleys, gang releases tested, serviced and
tightened/adjusted as necessary
|
|
|
|
|
| 16
|
Release stations visually inspected
|
|
|
|
|
| 17
|
Warning alarms (audible/visual) tested
|
|
|
|
|
| 18
|
Fan stop testedfootnote
|
|
|
|
|
| 19
|
10% of cylinders and pilot cylinder/s pressure tested every 10
years. All cylinders and pilot cylinder/s pressure tested before the 20-year
anniversary and every 10-year anniversary thereafter
|
|
|
|
|
| 20
|
Internal inspection of all control valves performed at least once
every five years
|
|
|
|
|
| 21
|
Distribution lines and nozzles blown through, by applying dry
working air
|
|
|
|
|
| 22
|
All doors, hinges and locks inspectedfootnote
|
|
|
|
|
| 23
|
All instruction and warning signs on installation
inspected
|
|
|
|
|
| 24
|
All flexible hoses renewed and check valves in manifold visually
inspected every 10 years
|
|
|
|
|
| 25
|
Release controls and distribution valves reconnected and system
put back in service
|
|
|
|
|
| 26
|
Inspection date tags attached
|
|
|
|
|