7.1.1 Each window shall be pressure tested at least once prior to being put
into service.
7.1.2 The window may be pressure tested together with the chamber after
installation into the chamber or placed within a test fixture whose window seat
dimensions, retaining ring, and the seals are identical to the chambers in which
case the test pressure is to be the design pressure for the chamber. In no case must
the test pressure exceed 1,5 times the design pressure or 138 N/mm2,
whichever is the lesser value. During this test, the temperature of the pressurising
medium should be the design temperature of the window. An alternate test procedure
in excess of design pressure and lower temperature may be adopted as specified in
ASME PVHO-1 within the limitations indicated. The test pressure shall be maintained
for a minimum of one hour but not more than four hours. The test may be carried out
using a test fixture whose window seat dimensions, retaining rings and seals are
identical to those of the chamber.