5.4.2.1 For test runs at zero speed, each run
should have a duration of 10 min (full scale). Each test case at each
heading should consist of a set of three tank runs with different
wave realizations.
5.4.2.2 Each tank run at forward speed should
be of the maximum practical duration, in any case not less than the
equivalent of 1 min at full scale, with the bow opening shutter being
opened and closed at the beginning and end of the test period of each
run. Each test run should comprise successive tank runs to represent
not less than 10 min of continuous full scale operation in one wave
realization at a given heading angle.
5.4.2.3 Each test case per heading angle (at forward
speed) should consist of an ensemble of test runs with different wave
realizations. The number of associated wave realizations should depend
on the heading angle as follows:
-
.1 three wave realization trains in head and bow
quartering seas;
-
.2 four wave realization trains in beam seas;
and
-
.3 five separate wave realization trains in following
and stern quartering seas.
5.4.2.4 Each wave realization train will be of
at least 10 min full scale total duration, each such wave train being
taken from the required wave spectrum.