4.1.1 LR requires to verify that all critical elements have been identified,
are suitable for their intended purpose, and that they meet their required
performance standards to ensure the safety and integrity of the installation.
4.1.2 Verification is to be based on performance standards that are subject to
approval by LR for each critical system/element derived from the risk
assessment.
4.1.3 LR will produce a project-specific Verification Plan for each case. This
will cover the following key aspects:
- Review and approval of critical elements.
- Review and approval of performance standards derived from the
risk assessment.
- Examination of design to confirm that the critical elements
meet the agreed performance standards.
- Examination during manufacture, construction, installation and
commissioning to confirm that the critical elements meet the approved
performance standards.
4.1.4 LR will apply a verification management process for new construction
projects. This will include the projectspecific Verification Plan, and detailed work
instructions for verification of each critical element at each stage of the project.
The Owner/Operator is to co-operate with this management process and the
requirements of the Verification Plan, and is to provide all necessary information
and access for LR to carry out its verification tasks.