8.2.1 The regasification trials program shall be prepared and submitted for
approval. The regasification trial program shall include technical and operational
information relevant to such testing.
8.2.2 Preliminary regasification trials shall consist of a running test of
the regasification system with LNG low flow for the function test and shall be
carried out after gas trials and before delivery.
8.2.3 The full capacity test of the regasification plant shall be carried out
at an operational site.
8.2.4 The test and measurements shall be carried according to these Rules,
manufacturer’s standards and industry best practice.
8.2.5 After completion of the regasification trials, a report quantifying
that the trials programme has been satisfactorily completed, shall be prepared and
submitted. A copy of the report shall be retained on board the barge or offshore
unit.