Following mounting of the door and immediately prior to
test, the laboratory should measure the actual clearances between
the door leaf and the door frame, and additionally for a double leaf
door between the adjacent door leaves. The clearances should be measured
for each door leaf at two positions along the top and bottom edges
and at three positions along each vertical edge.