4.1.1 Assurance that the Goals, Functional Objectives and Performance Requirements of the
Submarine Assurance Framework have been satisfied during the design, construction
and maintenance of the submarine is achieved by means of three related but
independent verification processes: Standards Justification, Design Verification and
Product Verification, which are applied according to a defined and agreed Submarine
Assurance Plan.
4.1.2 The Submarine Assurance Planning process establishes the intentions and scope of the
assurance activities to be carried out with respect to the submarine systems,
equipment and components together with the roles and responsibilities of the
entities involved.
4.1.3 The Standards Justification process is intended to ensure that the project
specifications, Rules, Codes and standards proposed and considered by the designer,
builder or maintenance organisation to satisfy the Performance Requirements are
considered by LR to be relevant and appropriate for the operating context, design,
construction or maintenance of the submarine. In verifying the Standards
Justification, LR reviews the justification provided by the designer, builder or
maintenance organisation for the use of the proposed project specifications, Rules,
Codes and standards in meeting the Performance Requirements. Based on the
justification together, with supporting evidence, and where necessary examination of
the proposed project specifications, Rules, Codes and standards, compliance with the
Performance Requirement(s) will be verified as appropriate.
4.1.4 The Design Verification process is intended to ensure that the detailed design of the
submarine satisfies the project specifications, Rules, Codes and standards selected
and proposed by the designer and previously verified by LR during the Standards
Justification process.
4.1.5 The Product Verification process is intended to ensure that the construction of the
submarine and the products used in the construction and maintenance of the submarine
satisfy the verified design and the project specifications, Rules, Codes and
standards selected and proposed by the designer, builder or maintenance organisation
and previously verified by LR during the Standards Justification process.
Figure 2.4.1 Submarine Assurance process diagram