TM1-BC(CSR)
Report on thickness measurement of all deck plating, all bottom plating
or side shell platingfootnote
| Ship's
name....................
|
IMO
number..........................
|
Class
Identity No
.
|
Report No
|
|
| STRAKE POSITION
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PLATE POSITION
|
No. or letter
|
As-built thk. mm
|
Voluntary thickness addition
mm
|
Renewal thickness mm (a)
|
Forward reading
|
Aft reading
|
Mean remaining corr.
addition, mm
[(c1)+(c2)]/2
|
| Gauged thk. mm
(b1)
|
Remaining corr. addition, mm
(c1)=(b1)-(a)
|
Gauged thk. mm
(b2)
|
Remaining corr. addition, mm
(c1)=(b1)-(a)
|
| P
|
S
|
P
|
S
|
P
|
S
|
P
|
S
|
P
|
S
|
| 12th
forward
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 11th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 10th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 9th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 7th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 6th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 5th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 4th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 3rd
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 2nd
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1st
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Amidships
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1st
aft
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 2nd
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 3rd
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 4th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 5th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 6th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 7th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 9th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 10th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 11th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 12th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Operator's signature
.........
|
Notes see following page
|
Notes to report TM1-BC(CSR) 1
1 This report should be used for recording
the thickness measurement of:
-
.1 all strength deck plating within cargo length
area;
-
.2 keel, bottom shell plating and bilge plating
within the cargo length area;
-
.3 side shell plating that is all wind and water
strakes within the cargo length area; and
-
.4 side shell plating that is selected wind and
water strakes outside the cargo length area.
2 The strake position should be clearly indicated as
follows:
-
.1 for strength deck indicate the number of the
strake of plating inboard from the stringer plate;
-
.2 for bottom plating indicate the number of the
strake of plating outboard from the keel plate; and
-
.3 for side shell plating give number of the
strake of plating sheer strake and letter as shown on shell expansion.
3 Only the deck plating strakes outside line of openings
should be recorded.
4 Measurements should be taken at the forward and aft
areas of all plates and the single measurements recorded should represent the average
of multiple measurements.
5 The remaining corrosion addition should be recorded
with the result of the gauged thickness minus the renewal thickness. If the result is
negative, the structure in way should be renewed, and the mark "R" should be
indicated in the right-hand column. If the result is between 0 and 0.5 mm (0
included), the structure in way should be additionally gauged, and the mark "S"
should be indicated in the right-hand column.
TM2-BC(CSR)(i)
Report on thickness measurement of shell and deck plating (one, two
or three transverse sections)
|
|
Ship's
name....................
|
IMO
number..........................
|
|
Class Identity No
.
|
Report No
|
| STRENGTH DECK AND SHEERSTRAKE PLATING
|
|
|
FIRST TRANSVERSE SECTION AT FRAME
NUMBER
|
SECOND TRANSVERSE SECTION AT FRAME
NUMBER
|
THIRD TRANSVERSE SECTION AT FRAME
NUMBER
|
| STRAKE POSITION
|
No. or letter
|
As-built thk. mm
|
Vol.
thk. add.mm
|
Ren.thk. mm (a)
|
Gauged thk. mm (b)
|
Remaining corr. addition, mm
(b)-(a)
|
No. or letter
|
As-built thk. mm
|
Vol. thk. add. mm
|
Ren. thk. mm (a)
|
Gauged thk. mm (b)
|
Remaining corr. addition, mm
(b)-(a)
|
No. or letter
|
As-built thk. mm
|
Vol. thk. add. mm
|
Ren.thk. mm (a)
|
Gauged thk. mm (b)
|
Remaining corr. addition, mm
(b)-(a)
|
| P
|
S
|
P
|
S
|
P
|
S
|
P
|
S
|
P
|
S
|
P
|
S
|
| Stringer plate
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1st
strake inboard
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 2nd
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 3rd
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 4th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 5th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 6th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 7th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 9th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 10th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 11th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 12th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 13th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 14th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| centre strake
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| sheerstrake
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| TOPSIDE TOTAL
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Operator's signature
.........
|
Notes see following page
|
|
Notes to report TM2-BC(CSR)(i)
1 This report should be used for recording the thickness
measurement of strength deck plating and sheer strake plating transverse sections
(one, two or three sections within the cargo length area, comprising of the
structural items (1), (2) and (3) as shown on the diagram of typical transverse
section (appendix 3)).
2 Only the deck plating outside the line of openings
should be recorded.
3 The topside area comprises deck plating, stringer
plate and sheer-strake (including rounded gunwales).
4 The exact frame station of measurement should be
stated.
5 The single measurements recorded should represent the
average of multiple measurements.
6 The remaining corrosion addition should be recorded
with the result of the gauged thickness minus the renewal thickness. If the result is
negative, the structure in way should be renewed, and the mark "R" should be
indicated in the right-hand column. If the result is between 0 and 0.5 mm (0
included), the structure in way should be additionally gauged, and the mark "S"
should be indicated in the right-hand column.
TM2-BC(CSR)(ii)
Report on thickness measurement of shell plating (one, two or three
transverse sections)
|
|
Ship's
name....................
|
IMO
number..........................
|
|
Class Identity No
.
|
Report No
|
| SHELL PLATING
|
|
|
FIRST TRANSVERSE SECTION AT FRAME
NUMBER
|
SECOND TRANSVERSE SECTION AT FRAME
NUMBER
|
THIRD TRANSVERSE SECTION AT FRAME
NUMBER
|
| STRAKE POSITION
|
No. or letter
|
As-built thk. mm
|
Vol.
thk. add.mm
|
Ren.thk. mm (a)
|
Gauged thk. mm (b)
|
Remaining corr. addition, mm
(b)-(a)
|
No. or letter
|
As-built thk. mm
|
Vol. thk. add. mm
|
Ren. thk. mm (a)
|
Gauged thk. mm (b)
|
Remaining corr. addition, mm
(b)-(a)
|
No. or letter
|
As-built thk. mm
|
Vol. thk. add. mm
|
Ren.thk. mm (a)
|
Gauged thk. mm (b)
|
Remaining corr. addition, mm
(b)-(a)
|
| P
|
S
|
P
|
S
|
P
|
S
|
P
|
S
|
P
|
S
|
P
|
S
|
| 1st below sheer strake
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 2nd
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 3rd
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 4th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 5th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 6th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 7th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 9th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 10th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 11th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 12th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 13th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 14th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 15th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 16th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 17th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 18th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 19th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 20th
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Keel strake
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| BOTTOM TOTAL
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Operator's signature
.........
|
Notes see following page
|
|
Notes to report TM2-BC(CSR)(ii)
1 This report should be used for recording
the thickness measurement of shell plating transverse sections (one, two or three
sections within cargo length area comprising of the structural items (4), (5), (6)
and (7) as shown on the diagram of typical transverse section (appendix 3)).
2 The bottom area comprises keel, bottom and bilge
plating.
3 The exact frame station of measurement should be
stated.
4 The single measurements recorded should represent the
average of multiple measurements.
5 The remaining corrosion addition should be recorded
with the result of the gauged thickness minus the renewal thickness. If the result is
negative, the structure in way should be renewed, and the mark "R" should be
indicated in the right-hand column. If the result is between 0 and 0.5 mm (0
included), the structure in way should be additionally gauged, and the mark "S"
should be indicated in the right-hand column.
TM3-BC(CSR)
Report on thickness measurement of longitudinal members (one, two or
three transverse sections)
|
|
Ship's
name....................
|
IMO
number..........................
|
|
Class Identity No
.
|
Report No
|
| STRENGTH DECK AND SHEERSTRAKE PLATING
|
|
|
FIRST TRANSVERSE SECTION AT FRAME
NUMBER
|
SECOND TRANSVERSE SECTION AT FRAME
NUMBER
|
THIRD TRANSVERSE SECTION AT FRAME
NUMBER
|
| STRUCTURAL MEMBER
|
Item No.
|
As-built thk. mm
|
Vol.
thk. add.mm
|
Ren.thk. mm (a)
|
Gauged thk. mm (b)
|
Remaining corr. addition, mm
(b)-(a)
|
Item No.
|
As-built thk. mm
|
Vol. thk. add. mm
|
Ren. thk. mm (a)
|
Gauged thk. mm (b)
|
Remaining corr. addition, mm
(b)-(a)
|
Item No.
|
As-built thk. mm
|
Vol. thk. add. mm
|
Ren.thk. mm (a)
|
Gauged thk. mm (b)
|
Remaining corr. addition, mm
(b)-(a)
|
| P
|
S
|
P
|
S
|
P
|
S
|
P
|
S
|
P
|
S
|
P
|
S
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Operator's signature
.........
|
Notes see following page
|
|
Notes to report TM3-BC(CSR)
1 This report should be used for recording
the thickness measurement of longitudinal members at transverse sections (one, two,
or three sections within the cargo length area, comprising of the appropriate
structural items (8) to (20) as shown on diagram of typical transverse section
(appendix 3)).
2 The exact frame station of measurement should be
stated.
3 The single measurements recorded should represent the
average of multiple measurements.
4 The remaining corrosion addition should be recorded
with the result of the gauged thickness minus the renewal thickness. If the result is
negative, the structure in way should be renewed, and the mark "R" should be
indicated in the right-hand column. If the result is between 0 and 0.5 mm (0
included), the structure in way should be additionally gauged, and the mark "S"
should be indicated in the right-hand column.
TM4-BC(CSR)
Report on thickness measurement of transverse structural members in
the double bottom, hopper side and topside water ballast tanks
| Ship's
name.....................
|
IMO
number..........................
|
Class
Identity No
.
|
Report No
|
|
| TANK DESCRIPTION:
|
| LOCATION OF STRUCTURE:
|
| STRUCTURAL MEMBER
|
ITEM
|
As-built thickness mm
|
Voluntary thickness addition mm
|
Renewal thickness mm (a)
|
Gauged thickness mm
(b)
|
Remaining corr. addition mm
(b)-(a)
|
| P
|
S
|
P
|
S
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Operator's signature
.........
|
Notes see following page
|
Notes to report TM4-BC(CSR)
1 This report should be used for recording
the thickness measurement of transverse structural members, comprising of the
appropriate structural items (23) to (25) as shown on diagram of typical transverse
section (appendix 3).
2 Guidance for areas of measurement is indicated on the
diagrams shown in appendix 3.
3 The single measurements recorded should represent the
average of multiple measurements.
4 The remaining corrosion addition should be recorded
with the result of the gauged thickness minus the renewal thickness. If the result is
negative, the structure in way should be renewed, and the mark "R" should be
indicated in the right-hand column. If the result is between 0 and 0.5 mm (0
included), the structure in way should be additionally gauged, and the mark "S"
should be indicated in the right-hand column.
TM5-BC(CSR)
Report on thickness of cargo hold transverse bulkheads
| Ship's
name.....................
|
IMO
number..........................
|
Class
Identity No
.
|
Report No
|
|
| HOLD DESCRIPTION:
|
| LOCATION OF STRUCTURE:
|
FRAME NO.:
|
| STRUCTURAL COMPONENT
(PLATING/STIFFENER)
|
As-built thickness mm
|
Voluntary thickness addition
mm
|
Renewal thickness mm (a)
|
Gauged thickness mm
(b)
|
Remaining corr. addition mm
(b)-(a)
|
| P
|
S
|
P
|
S
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Operator's signature
.........
|
Notes see following page
|
Notes to report TM5-BC(CSR)
1 This report form should be used for
recording the thickness measurement of cargo hold transverse bulkheads.
2 Guidance for areas of measurement is indicated on the
diagrams shown in appendix 3.
3 The single measurements recorded should represent the
average of multiple measurements.
4 The remaining corrosion addition should be recorded
with the result of the gauged thickness minus the renewal thickness. If the result is
negative, the structure in way should be renewed, and the mark "R" should be
indicated in the right-hand column. If the result is between 0 and 0.5 mm (0
included), the structure in way should be additionally gauged, and the mark "S"
should be indicated in the right-hand column.
TM6-BC(CSR)
Report on thickness measurement of miscellaneous structural
members
| Ship's
name.....................
|
|
IMO
number..........................
|
Class
Identity No
.
|
Report No
|
| STRUCTURAL MEMBER:
|
SKETCH
|
| LOCATION OF STRUCTURE:
|
|
| Description
|
As-built thk. mm
|
Voluntary thickness addition
mm
|
Renewal thickness mm (a)
|
Gauged thickness mm
(b)
|
Remaining corr. addition mm
(b)-(a)
|
| P
|
S
|
P
|
S
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Operator's signature
.........
|
|
Notes see following page
|
Notes to report TM6-BC(CSR)
1 This report should be used for recording the thickness
measurement of miscellaneous structural members including the structural items (28),
(29) and (30) as shown on diagram of typical transverse section (appendix 3).
2 Guidance for areas of measurement is indicated in
appendix 3.
3 The single measurements recorded should represent the
average of multiple measurements.
4 The remaining corrosion addition should be recorded
with the result of the gauged thickness minus the renewal thickness. If the result is
negative, the structure in way should be renewed, and the mark "R" should be
indicated in the right-hand column. If the result is between 0 and 0.5 mm (0
included), the structure in way should be additionally gauged, and the mark "S"
should be indicated in the right-hand column.
TM7-BC(CSR)
Report on thickness measurement of cargo hold transverse
frames
|
|
Ship's
name....................
|
IMO
number..........................
|
|
Class Identity No
.
|
Report No
|
| CARGO HOLD NO.
|
|
|
UPPER PART
|
MID PART
|
LOWER PART
|
| FRAME NUMBER
|
As-built thk
|
Volun.
thk. add.
|
Renewal
thickness
(a)
|
Gauged thickness mm
(b)
|
Remaining corr. addition mm
(b)-(a)
|
As-built thk
|
Volun.
thk. add
|
Renewal
thickness
(a)
|
Gauged thickness mm
(b)
|
Remaining corr. addition mm
(b)-(a)
|
As-built thk
|
Volun.
thk. add
|
Renewal
thickness
(a)
|
Gauged thickness mm
(b)
|
Gauged thickness mm
(b)
|
| mm
|
mm
|
mm
|
P
|
S
|
P
|
S
|
mm
|
mm
|
mm
|
P
|
S
|
P
|
S
|
mm
|
mm
|
mm
|
P
|
S
|
P
|
S
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Operator's signature
.........
|
Notes see following page
|
Notes to report TM7-BC(CSR)
This report should be used for recording the thickness measurement of:
1 Cargo hold transverse frames, i.e.
structural item (34) as shown on the diagram of typical transverse section in
appendix 3.
2 Guidance for areas of measurement is indicated on the
diagrams shown in appendix 3.
3 The single measurement recorded should represent the
average of multiple measurements.
4 The location and pattern of measurements should be
indicated on the sketches of hold frames shown below.
5 The remaining corrosion addition should be recorded
with the result of the gauged thickness minus the renewal thickness. If the result is
negative, the structure in way should be renewed, and the mark "R" should be
indicated in the right-hand column. If the result is between 0 and 0.5 mm (0
included), the structure in way should be additionally gauged, and the mark "S"
should be indicated in the right-hand column.