4.1 The dedicated clean ballast tanks may be ballasted
through clean pumps and piping with sufficient ballast to clear port
draught requirements.
4.2 The required amount of water for flushing
of the piping may be taken into the dedicated clean ballast tanks
overdeck or through clean cargo piping.