5.3.1 The monitoring system of the EGC system
should be subject to survey on installation and at Initial, Annual/Intermediate
and Renewals Surveys by the Administration.
5.3.2 In accordance with regulation 10 of MARPOL
Annex VI monitoring systems of EGC units may also be subject to inspection
by port State control.
5.3.3 In those instances where an EGC system is
installed, section 2.6 of the Supplement to the ship’s International
Air Pollution Prevention Certificate should be duly completed.