Goal
To maintain the cargo tank pressure and temperature within design limits of the
containment system and/or carriage requirements of the cargo.
7.1 Methods of control
7.1.1 With the exception of tanks designed to withstand
full gauge vapour pressure of the cargo under conditions of the upper ambient design
temperatures, cargo tanks' pressure and temperature shall be maintained at all times
within their design range by either one, or a combination of, the following
methods:
-
.1 reliquefaction of cargo vapours;
-
.2 thermal oxidation of vapours;
-
.3 pressure accumulation; and
-
.4 liquid cargo cooling.
7.1.2 For certain cargoes, where required by chapter
17, the cargo containment system shall be capable of withstanding the full vapour
pressure of the cargo under conditions of the upper ambient design temperatures,
irrespective of any system provided for dealing with boil-off gas.
7.1.3 Venting of the cargo to maintain cargo tank
pressure and temperature shall not be acceptable except in emergency situations. The
Administration may permit certain cargoes to be controlled by venting cargo vapours
to the atmosphere at sea. This may also be permitted in port with the authorization
of the port Administration.
7.2 Design of systems
For normal service, the upper ambient design temperature shall be:
For service in particularly hot or cold zones, these design temperatures
shall be increased or decreased, to the satisfaction of the Administration. The
overall capacity of the system shall be such that it can control the pressure within
the design conditions without venting to atmosphere.
LR 7.2-01 Where the APBU notation is to be assigned, the
documentation listed in LR IV is to be submitted to allow verification of both the
heat leakage calculations and proposed maximum voyage duration. The information
submitted is to include the maximum allowable temperature upon termination of
loading and isolation of the vapour return.
LR 7.2-02 Filling limits of cargo tanks are to be in accordance
with the relevant requirements of Chapter 15. If cargo vapour pressure/temperature
control as per Chapter 7 is provided, then dual-setting pressure relief valves may
be installed and filling limits calculated accordingly.
LR 7.2-03 The materials are to comply with the requirements of
Chapter 6 of the Rules for Materials as applicable to the individual systems.
LR 7.2-04 Where it is intended that service will be in a colder
or hotter zone, suitable ambient design temperatures may be approved for such
service and the class notation will indicate the geographical limits of the service,
see LR III.
LR 7.2-05 The thermal insulation properties and design
arrangements of the piping insulation are to be taken into consideration when
calculating the heat balance of the containment system and capacity of the
pressure/temperature control system.
7.3 Reliquefaction of cargo vapours
7.3.1
General
The reliquefaction system may be arranged in one of the following
ways:
-
.1 a direct system, where evaporated cargo is
compressed, condensed and returned to the cargo tanks;
-
.2 an indirect system, where cargo or
evaporated cargo is cooled or condensed by refrigerant without being
compressed;
-
.3 a combined system, where evaporated cargo is
compressed and condensed in a cargo/refrigerant heat exchanger and returned
to the cargo tanks; and
-
.4 if the reliquefaction system produces a
waste stream containing methane during pressure control operations within
the design conditions, these waste gases, as far as reasonably practicable,
are disposed of without venting to atmosphere.
Note:
- The requirements of chapters 17 and 19 may preclude the use of one or more of
these systems or may specify the use of a particular system.
LR 7.3-01 Cooling water return from heat exchangers which contain
cargo are not to be led into the main machinery spaces.
7.3.2
Compatibility
Refrigerants used for reliquefaction shall be compatible with the cargo
they may come into contact with. In addition, when several refrigerants are used and
may come into contact, they shall be compatible with each other.
7.4 Thermal oxidation of vapours
7.4.1
General
Maintaining the cargo tank pressure and temperature by means of thermal
oxidation of cargo vapours, as defined in 1.2.52 and 16.2 shall be permitted only
for LNG cargoes. In general:
-
.1 thermal oxidation systems shall exhibit no
externally visible flame and shall maintain the uptake exhaust temperature
below 535°C;
-
.2 arrangement of spaces where oxidation
systems are located shall comply with 16.3 and supply systems shall comply
with 16.4; and
-
.3 if waste gases coming from any other system
are to be burnt, the oxidation system shall be designed to accommodate all
anticipated feed gas compositions.
7.4.2
Thermal oxidation systems
Thermal oxidation systems shall comply with the following:
-
.1 each thermal oxidation system shall have a
separate uptake;
-
.2 each thermal oxidation system shall have a
dedicated forced draught system; and
-
.3 combustion chambers and uptakes of thermal
oxidation systems shall be designed to prevent any accumulation of gas.
7.4.3
Burners
Burners shall be designed to maintain stable combustion under all design
firing conditions.
7.4.4
Safety
7.4.4.1 Suitable devices shall be installed and
arranged to ensure that gas flow to the burner is cut off unless satisfactory
ignition has been established and maintained.
7.4.4.2 Each oxidation system shall have provision to
manually isolate its gas fuel supply from a safely accessible position.
7.4.4.3 Provision shall be made for automatic purging
the gas supply piping to the burners by means of an inert gas, after the
extinguishing of these burners.
7.4.4.4 In case of flame failure of all operating
burners for gas or oil or for a combination thereof, the combustion chambers of the
oxidation system shall be automatically purged before relighting.
7.4.4.5 Arrangements shall be made to enable the
combustion chamber to be manually purged.
7.5 Pressure accumulation systems
The containment system insulation, design pressure or both shall be
adequate to provide for a suitable margin for the operating time and temperatures
involved. No additional pressure and temperature control system is required.
Conditions for acceptance shall be recorded in the International Certificate of
Fitness for the Carriage of Liquefied Gases in Bulk required in 1.4.4.
LR 7.5-01 Where the APBU notation is to be assigned, the
emergency procedures required by Ch 18 are to include details of the procedure for
achieving equalisation between the cargo tank vapour space and the interbarrier
space, and details are to be submitted.
LR 7.5-02 For cargo tanks of membrane type, where the vent mast is
of sufficient height that liquefied cargo cannot be vented due to the design head of
the cargo tank, then means of equalisation between the cargo tank vapour and the
interbarrier space may be omitted.
7.6 Liquid cargo cooling
The bulk cargo liquid may be refrigerated by coolant circulated through
coils fitted either inside the cargo tank or onto the external surface of the cargo
tank.
7.7 Segregation
Where two or more cargoes that may react chemically in a dangerous manner
are carried simultaneously, separate systems as defined in 1.2.47, each complying
with availability criteria as specified in 7.8, shall be provided for each cargo.
For simultaneous carriage of two or more cargoes that are not reactive to each other
but where, due to properties of their vapour, separate systems are necessary,
separation may be by means of isolation valves.
7.8 Availability
The availability of the system and its supporting auxiliary services
shall be such that:
-
.1 in case of a single failure of a mechanical
non-static component or a component of the control systems, the cargo tanks'
pressure and temperature can be maintained within their design range without
affecting other essential services;
-
.2 redundant piping systems are not
required;
-
.3 heat exchangers that are solely necessary
for maintaining the pressure and temperature of the cargo tanks within their
design ranges shall have a standby heat exchanger, unless they have a
capacity in excess of 25% of the largest required capacity for pressure
control and they can be repaired on board without external resources. Where
an additional and separate method of cargo tank pressure and temperature
control is fitted that is not reliant on the sole heat exchanger, then a
standby heat exchanger is not required; and
-
.4 for any cargo heating or cooling medium,
provisions shall be made to detect the leakage of toxic or flammable vapours
into an otherwise non-hazardous area or overboard in accordance with 13.6.
Any vent outlet from this leak detection arrangement shall be to a safe
location and be fitted with a flame screen.
LR 7.8-01 It is recommended that a reasonable margin in plant
output over maximum load be allowed for possible overall inefficiencies under
service conditions. It is also recommended that due regard be given to any
additional capacity required to deal with cargo loading conditions. A refrigeration
unit comprises a compressor and its prime mover and the associated heat exchangers,
together with the fittings and controls necessary to permit independent operation of
the unit. Where the system is of the combined or cascade type, a unit will include
the compressors, prime movers and heat exchangers for all sections of the process.
Separate piping systems are not required.
LR 7.9 General
Information and plans
LR 7.9-01 Details of the proposed system of cargo
pressure/temperature control are to be submitted for consideration. Information and
plans are to be submitted as detailed in Pt 6, Ch 3,1.2 of the Rules for Ships as
applicable. The circuit diagrams are to show the complete refrigeration system and
include the temperatures and pressures at the various points in the process system.
The capacity of the refrigeration units is to be given. The information is to
include the particulars of the intended cargoes, maximum vapour pressure and minimum
cargo temperature. Where no refrigeration plant is fitted, the boil-off calculations
are to be submitted to confirm the manner in which the boil-off will be handled.
Construction requirements
LR 7.9-02 Mechanical refrigeration systems required by 7.1.1.1
are to be constructed under LR’s Special Survey in accordance with the requirements
of this Chapter and Pt 6, Ch 3 of the Rules for Ships where applicable. Process
pressure vessels are to comply with Pt 5, Ch 10 and 11 as applicable.
LR 7.9-03 It is recommended that adequate spares, together with
the tools necessary for maintenance or repair be carried. The spares are to be
determined by the Owner according to the design and intended service. The
maintenance of the spares is the responsibility of the Owner.
Class notation
LR 7.9-04 For the class notation to be assigned for
reliquefaction or refrigeration equipment constructed, installed and tested in
accordance with this Chapter, see LR III.3.
LR 7.9-05 For insulation requirements, see 4.10 and
4.19.3
LR 7.9-06 On completion, the installation is to be tested to
prove its capability to maintain the class notation temperature and pressure.
LR 7.10 Nitrogen/inert gas systems
fitted for purposes other than inerting required by SOLAS Reg. II-2/4.5.5.1
LR 7.10-01 Where nitrogen gas is used for purposes other than
inerting, e.g. cargo padding and reliquefication, the following requirements are to
be applied.
LR 7.10-02 The nitrogen generator is to be capable of delivering
high purity nitrogen in accordance with Ch 15, 2.2.1.2.5 of the FSS Code, as amended
by MSC.367(93). In addition to Ch 15, 2.2.2.4 of the FSS Code, as amended by
MSC.367(93), the system is to be fitted with automatic means to discharge ‘off-spec’
gas to the atmosphere during start-up and abnormal operation.
LR 7.10-03 The feed air treatment system fitted to remove free
water, particles and traces of oil from the compressed air as required by Ch 15,
2.4.1.2 of the FSS Code, as amended by MSC.367(93), is also to preserve the
specification temperature.
LR 7.10-04 The oxygen-enriched air from the nitrogen generator
and the nitrogen-product enriched gas from the protective devices of the nitrogen
receiver are to be arranged to discharge to a safe location on the open deck. This
safe location needs to address the two types of discharges separately.
For oxygen-enriched air from the nitrogen generator, safe locations on
the open deck are:
- outside of hazardous areas as defined by 1.2.24;
- not within 3 m of areas traversed by personnel;
- not within 6 m of air intakes for machinery and all ventilation
inlets.
For nitrogen-product enriched gas from the protective devices of the
nitrogen receiver, safe locations on the open deck are:
- not within 3 m of areas traversed by personnel;
- not within 6 m of air intakes for machinery and all ventilation
inlets/outlets.
LR 7.10-05 In order to permit maintenance, means of isolation are
to be fitted between the generator and the receiver.
LR 7.10-06 The requirements given in Ch 15, 2.2.2, 2.2.4, 2.4.1
and 2.4.2 of the FSS Code, as amended by MSC.367(93), apply to the systems, as
applicable.
LR 7.10-07 Materials used in inert gas systems are to be suitable
for their intended purpose in accordance with the Rules for Materials.
LR 7.10-08 All the equipment is to be installed on board and
tested under working conditions to the satisfaction of the Surveyor.
LR 7.10-09 The two non-return devices as required by Ch 15,
2.2.3.1.1 of the FSS Code, as amended by MSC.367(93), are to be fitted in the inert
gas main. The non-return devices are to comply with Ch 15, 2.2.3.1.2 and 2.2.3.1.3
of the FSS Code, as amended by MSC.367(93); however, where the connections to the
cargo tanks, to the hold spaces or to cargo piping are not permanent, the non-return
devices required by Ch 15, 2.2.3.1.2 of the FSS Code, as amended by MSC.367(93), may
be substituted by two non-return valves.
LR 7.10-10 Detailed instruction manuals shall be provided on
board as required by Ch 15, 2.2.5 of the FSS Code, as amended by MSC.367(93).