Pumping of bilge water overboard via 15 ppm equipment from
tank listed in item 3.3 in the Supplement to the IOPPC or from engine-room
bilge wells
|
Date
|
Code
|
Item No.
|
Record of operations/signature of officer in charge
|
| dd-MONTH-yyyy
|
E
|
16
|
Pump start hh:mm at xx deg xx min N/S, xx deg xx min E/W from
|
|
|
|
|
[Name of sec 3.3 Tank & Designation]
|
|
|
|
18
|
Stop hh:mm
|
|
|
|
|
signed: (Officer-in-charge, Name & Rank) dd-MONTH-yyyy
|