3.1 The assessment can be carried out at two different levels as listed below:
.1 Minimum power lines assessment; and
.2 Simplified assessment.
3.2 The ship should be considered to have sufficient power to maintain the manoeuvrability in adverse conditions if it fulfils one of these assessment levels.