2.2.1 The tasks are allocated to, and operated
by the operator on, a defined set of multi-functional “task
stations”.
2.2.2 The scope of an INS may differ dependent
on the number and kind of tasks integrated.
2.2.3 Configuration, use, operation and display
of the INS is situation-dependent on:
- shift underway, at anchor, and moored,
- manual and automatic navigation control in different waters,
- planned routine navigation and special manoeuvres.