9.1 A survey report shall be completed for the
CAS survey. The report shall indicate the date, location (place),
and where relevant, whether or not the CAS survey was carried out
in dry-dock afloat or at sea. When the CAS survey is split between
different survey stations, a report shall be made for each portion
of the CAS survey.
9.2 Survey records relating to the CAS survey,
including actions taken, shall form an auditable documentary trail,
which shall be made available to the Administration, if requested.
9.3 In addition, the following shall be included
in each CAS survey report:
9.4 Where no defects are found, this shall be
stated in the report for each space.
9.5 The narrative report shall be supplemented
by photographs showing the general condition of each space, including
representative photographs or sketches of any of the above reported
items.
9.6 The thickness measurement report shall be
verified and endorsed by the attending surveyor.
9.7 The attending surveyors shall sign the CAS
survey report.