14.2.1 At each Special Survey, the Surveyor is to examine and test as necessary
the following components of the process plant facility:
- Major equipment of the production and process plant.
- Oil or gas processing system.
- Production plant safety systems.
- Production plant utility systems.
- Relief and flare system.
- Well control system.
14.2.3 Piping systems and valves are to be examined for leaks and corrosion.