7.1.1 Where it is proposed to fit additional anodes or replace existing ones,
                                 full details including information listed below are to be submitted for
                                 consideration.
                                 
                                    - Existing CP system performance study
 
                                    - Cause of any premature failure of the system
 
                                    - Design calculations and drawings
 
                                    - CP potential modelling
 
                                    - Deviations from class requirements based on in service
                                       performance on station