Regulation 2
Definitions
Regulation 2.23
reads as follows:
-
"New ship means a ship:
-
.1 for which building contract is placed on or after 1 January 2013; or
-
.2 in the absence of a building contract, the keel of which is laid or which is
at a similar stage of construction on or after 1 July 2013; or
-
.3 the delivery of which is on or after 1 July 2015."
Interpretation:
1.1 For the application of the definition "new ship" as specified in
regulation 2.2.18 to each Phase specified in table 1 of regulation 24, it should be
interpreted as follows:
-
.1 the date specified in regulation 2.2.18.1 should be replaced with the
start date of each Phase;
-
.2 the date specified in regulation 2.2.18.2 should be replaced with the
date six months after the start date and end date of each Phase; and
-
.3 the date specified in regulation 2.2.18.3 should, for Phase 1, 2 and
3, be replaced with the date 48 months after the start date and end date of each
Phase.
1.2 With the above interpretations, the required EEDI of each phase is applied
to the following new ship which falls into one of the categories defined in regulations
2.2.5, 2.2.7, 2.2.9, 2.2.14, 2.2.15, 2.2.22, 2.2.29 and to which chapter 4 is
applicable:
-
.1 the required EEDI of Phase 0 is applied to the following new ship:
-
.1 the building contract of which is placed in Phase 0, and the delivery is
before 1 January 2019; or
-
.2 the building contract of which is placed before Phase 0, and the delivery is
on or after 1 July 2015 and before 1 January 2019; or
-
in the absence of a building contract:
-
.3 the keel of which is laid or which is at a similar stage of construction on
or after 1 July 2013 and before 1 July 2015, and the delivery is before 1
January 2019; or
-
.4 the keel of which is laid or which is at a similar stage of construction
before 1 July 2013, and the delivery is on or after 1 July 2015 and before 1
January 2019.
-
.2 the required EEDI of Phase 1 is applied to the following new ship:
-
.1 the building contract of which is placed in Phase 1, and the
delivery is before 1 January 2024; or
-
.2 the building contract of which is placed before Phase 1, and the
delivery is on or after 1 January 2019 and before 1 January 2024; or
-
in the absence of a building contract:
-
.3 the keel of which is laid or which is at a similar stage of
construction on or after 1 July 2015 and before 1 July 2020, and the delivery
is before 1 January 2024; or
-
.4 the keel of which is laid or which is at a similar stage of
construction before 1 July 2015, and the delivery is on or after 1 January 2019
and before 1 January 2024.
-
.3 the required EEDI of Phase 2 is applied to the following new
ship:
-
.4 the required EEDI of Phase 3 is applied to the following new
ship: