Clasification Society Rulefinder 2016 - Version 9.25
Clasification Society Rules and Regulations - Rules and Regulations for the Classification of Offshore Units, January 2016 - Part 7 SAFETY SYSTEMS, HAZARDOUS AREAS AND FIRE - Chapter 3 Fire Safety - Section 1 General |
||
![]() Section 1 General1.1 Application1.1.1 The requirements for fire and gas detection systems and other safety systems are to be in accordance with Pt 7, Ch 1 Safety and Communication Systems. The requirements for hazardous areas and ventilation are to comply with Pt 7, Ch 2 Hazardous Areas and Ventilation. 1.1.2 Compliance with the requirements for fire safety of the National Administrations in the area where the unit is located and/or the country in which the unit is registered, is to be demonstrated by the issue of appropriate certification in accordance with Pt 1, Ch 2, 1.1 Application. 1.1.3 In addition to the requirements of Pt 7, Ch 3, 1.1 Application 1.1.1 and Pt 7, Ch 3, 1.1 Application 1.1.2, units with production and process plant are to comply with the additional requirements given in Pt 7, Ch 3, 3 Additional requirements for units with production and process plant. 1.1.4 Units with crude oil storage tanks are, in general, to comply with the relevant requirements for tankers detailed in Chapter II-2 - Construction - Fire protection, fire detection and fire extinction and IMO International Code for Fire Safety Systems (FSS) (hereinafter referred to as FSS Code). Where this is not practicable owing to the general construction of the unit, special consideration will be given to other arrangements which provide equivalent protection, see also Pt 3, Ch 3, 1.4 Installation layout and safety. 1.1.5 The definitions given in Pt 7, Ch 3, 2 Definitions are, in general, in accordance with the 2009 MODU Code - Code for the Construction and Equipment of Mobile Offshore Drilling Units, 2009 – Resolution A.1023(26) (hereinafter referred to as 2009 MODU Code) and are included for reference purposes only. Additional definitions for offshore units are also given. Where applicable, reference to these definitions may be used in other Parts of these Rules. 1.1.6 For units containing drilling facilities, reference should be made to the requirements of the 2009 MODU Code and the requirements of Pt 3, Ch 7 Drilling Plant Facility for fire safety and escape and evacuation facilities. 1.1.7 Installations with liquefied gas storage in bulk and/or vapour discharge and loading manifolds/facilities are, in general, to comply with the requirements of Pt 11, Ch 11 Fire Prevention and Extinction . It should be noted that Pt 11, Ch 11 Fire Prevention and Extinction of these Rules and Regulations reflects the requirements of the IGC Code - International Code for the Construction and Equipment of Ships Carrying Liquefied Gases in Bulk and the associated Clasification Society Register’s Rules and Regulations for the Construction and Classification of Ships for the Carriage of Liquefied Gases in Bulk, January 2016 1.2 Submission of documentation1.2.1 The requirements for submissions of documentation are given in Pt 7, Ch 3, 1.2 Submission of documentation 1.2.7 to Pt 7, Ch 3, 1.2 Submission of documentation 1.2.10, which are to be complied with where applicable. 1.2.2 Additional requirements with respect to unit types as indicated in this Section should also be complied with, as applicable, as in Pt 7, Ch 3, 1.2 Submission of documentation 1.2.3 to Pt 7, Ch 3, 1.2 Submission of documentation 1.2.10. 1.2.3 In addition to the requirements of Pt 7, Ch 1 Safety and Communication Systems of these Rules, when Lloyd’s Register (LR) is authorised to carry out approvals of fire protection, detection and extinction arrangements on behalf of a National Administration or the requirements of Pt 1, Ch 2, 1 Conditions for classification of these Rules are applicable, the plans and documents detailed below and required by Pt 7, Ch 3, 1.2 Submission of documentation 1.2.7, Pt 7, Ch 3, 1.2 Submission of documentation 1.2.8, Pt 7, Ch 3, 1.2 Submission of documentation 1.2.9 and Pt 7, Ch 3, 1.2 Submission of documentation 1.2.10 are to be submitted for approval, together with all additional relevant information, such as the intended function of the unit, the gross tonnage and the power of machinery. 1.2.4 The requirements for active and passive type fire protection systems are to be clearly defined within the unit’s ‘Fire and Explosion Evaluation’ (FEE) report, see Pt 7, Ch 3, 2.4 Fire and Explosion Evaluation (FEE), and the requirements for means of escape, evacuation and rescue are to be clearly defined within the unit’s ‘Escape, Evacuation and Rescue Assessment’ (EERA), see Pt 7, Ch 3, 4.1 General requirements 4.1.2. Both reports are to be submitted for acceptance and in conjunction with the plans required below. 1.2.5 In the case of units with production and process plant, the FEE Report required by Pt 7, Ch 3, 1.2 Submission of documentation 1.2.4, which is also supporting the preparation and appraisal of information required in Pt 7, Ch 3, 1.2 Submission of documentation 1.2.8, Pt 7, Ch 3, 1.2 Submission of documentation 1.2.9 and Pt 7, Ch 3, 1.2 Submission of documentation 1.2.10, and the information required by Pt 7, Ch 3, 1.2 Submission of documentation 1.2.7, are to be submitted for review with full details of the water deluge system and/or water monitor system as required by Pt 7, Ch 3, 3.4 Water deluge systems, water monitors and foam systems. 1.2.6 For units with production and process plant, plans of escape routes with details of their protection are to be submitted for acceptance as required by Pt 7, Ch 3, 1.2 Submission of documentation 1.2.7. 1.2.7 For fire protection, the following plans and documents are to be
submitted:
1.2.8 For fire-extinguishing, the following plans and particulars are to be
submitted:
1.2.9 For fire-control, general arrangement plans are to be submitted:
1.2.10 The general arrangement plans, as required by Pt 7, Ch 3, 1.2 Submission of documentation 1.2.9, are to be permanently exhibited in all units,
for the guidance of those on board:
|
||
|
||
|