Construction
Clasification Society 2024 - Version 9.40
Statutory Documents - IMO Publications and Documents - Resolutions - Maritime Safety Committee - Resolution MSC.287(87) – Adoption of the International Goal-Based Ship Construction Standards for Bulk Carriers and Oil Tankers – (Adopted on 20 May 2010) - Annex – International Goal-Based Ship Construction Standards for Bulk Carriers and Oil Tankers - 5 Tier II – Functional Requirements - Construction

Construction

II.11 Construction quality procedures

 Ships shall be built in accordance with controlled and transparent quality production standards with due regard to intellectual property rights. The ship construction quality procedures shall include, but not be limited to, specifications for material, manufacturing, alignment, assembling, joining and welding procedures, surface preparation and coating.

II.12 Survey during construction

 A survey plan shall be developed for the construction phase of the ship, taking into account the ship type and design. The survey plan shall contain a set of requirements, including specifying the extent and scope of the construction survey(s) and identifying areas that need special attention during the survey(s), to ensure compliance of construction with mandatory ship construction standards.


Copyright 2022 Clasifications Register Group Limited, International Maritime Organization, International Labour Organization or Maritime and Coastguard Agency. All rights reserved. Clasifications Register Group Limited, its affiliates and subsidiaries and their respective officers, employees or agents are, individually and collectively, referred to in this clause as 'Clasifications Register'. Clasifications Register assumes no responsibility and shall not be liable to any person for any loss, damage or expense caused by reliance on the information or advice in this document or howsoever provided, unless that person has signed a contract with the relevant Clasifications Register entity for the provision of this information or advice and in that case any responsibility or liability is exclusively on the terms and conditions set out in that contract.