Issued upon completion of renewal survey
|
|
|
|
|
|
|
|
General particulars
|
|
|
|
| Ship's name:
|
|
Administration/recognized organization identity number:
|
|
|
|
IMO
number:
|
| Port of registry:
|
|
National
flag:
|
|
|
|
|
| Deadweight
|
|
Gross
tonnage:
|
| (metric tonnes):
|
|
|
National:
|
|
|
|
|
ITC
(1969):
|
| Date of build:
|
|
Classification notation:
|
| Date of
major conversion:
|
|
|
|
| Type of
conversion:
|
|
|
|
|
|
|
|
| 1 The
survey reports and documents listed below have been reviewed by the
undersigned and found to be satisfactory.
|
| 2 A
summary of the survey is attached herewith on sheet 2.
|
| 3 The
renewal survey has been completed in accordance with the present Code
on
|
| (date) .......................
|
| Condition evaluation report (executive hull summary report) completed
by
|
Name
Signature
|
Title
|
| Office
|
Date
|
|
| Condition evaluation report (executive hull summary report) verified
by
|
Name
Signature
|
Title
|
| Office
|
Date
|
|
| Attached reports and documents:
|
|
|
1)
|
|
|
|
|
|
2)
|
|
|
|
|
|
3)
|
|
|
|
|
|
4)
|
|
|
|
|
|
5)
|
|
|
|
|
|
|
|
|
|
|
Contents of condition evaluation report (executive hull summary
report)
|
| Part 1 – General particulars:
|
- See front page
|
| Part 2 – Report review:
|
- Where and how survey was done
|
| Part 3 – Close-up survey:
|
- Extent (which tanks/holds)
|
| Part 4 – Thickness measurements:
|
- Reference to thickness measurement report
- Summary of
where measured
- Separate form indicating the spaces with
substantial corrosion, and corresponding:
- - thickness diminution
- - corrosion pattern
|
| Part 5 – Tank/hold corrosion prevention system:
|
- Separate form indicating:
- - location of coating
- - condition of coating (if applicable)
|
| Part 6 – Repairs:
|
- Identification of spaces/areas
|
| Part 7 – Condition of class (recommendations)/flag State
requirements:
|
|
| Part 8 – Memoranda:
|
- Acceptable defects
|
|
|
|
- Any points of attention for future surveys, e.g. for
suspect areas
|
|
|
|
- Extended annual/intermediate survey due to coating
breakdown
|
| Part 9 – Conclusion:
|
- Statement on evaluation/verification of survey
report
|
|
|
|
|
|
|
|
Extract of thickness measurements for ships not built under the IACS
Common Structural Rules
|
| Reference is made to the thickness measurement report:
|
Position of substantially corroded
tanks/areas1
or areas with deep pitting3
|
Thickness diminution [%]
|
Corrosion pattern2
|
Remarks: (e.g. reference to attached
sketches)
|
|
|
|
|
|
|
|
|
|
|
| Notes:
|
| 1
|
Substantial corrosion, i.e. 75 to 100 per cent of acceptable
margins wasted.
|
| 2
|
P = Pitting
|
|
|
C = Corrosion in general
|
| 3
|
Any bottom plating with a pitting intensity of 20% or more, with
wastage in the substantial corrosion range or having an average depth of
pitting of ⅓ or more of actual plate thickness shall be noted.
|
|
|
|
|
|
|
|
Extract of thickness measurements for ships built under the IACS
Common Structural Rules
|
| Reference is made to the thickness measurements report:
|
|
Position of substantially corroded tanks/areas1 or areas with
deep pitting
|
tm - tren (mm)
|
Corrosion pattern2
|
Remarks (e.g. reference to attached sketches)
|
|
|
|
|
|
|
| Notes:
|
| 1
|
Substantial corrosion, an extent of corrosion such that the
assessment of the corrosion pattern indicates a measured thickness between
tren + 0.5 mm and tren.
|
| 2
|
P = Pitting
C = Corrosion in general
Areas with deep
pitting assessed according to section 8.2 shall be recorded in this
column.
|
|
|
|
|
|
|
|
Tank/hold corrosion prevention system
|
|
|
|
|
|
|
|
Tank/hold Nos.1
|
Tank/hold corrosion prevention system2
|
Coating condition3
|
Remarks
|
|
|
|
|
|
|
|
|
|
|
|
|
| Notes:
|
| 1
|
All ballast tanks and cargo holds shall be listed.
|
| 2
|
C = Coating
|
|
|
NP = No protection
|
| 3
|
Coating condition according to the following standard:
|
|
|
GOOD
|
condition with only minor spot rusting.
|
|
|
FAIR
|
condition with local breakdown of coating at edges of stiffeners
and weld connections and/or light rusting over 20% or more of areas under
consideration, but less than as defined for POOR condition.
|
|
|
POOR
|
condition with general breakdown of coating over 20% or more of
areas or hard scale at 10% or more of areas under consideration.
|
|
|
If coating condition POOR is given, extended annual surveys shall
be introduced. This shall be noted in part 8 of the contents of the
condition evaluation report (executive hull summary report).
|