The following information will enable the Company in co-operation
with the RO to develop a Survey Plan complying with the requirements
of the CAS.
It is essential that the Company provides, when completing
the present questionnaire, up-to-date information.
The present questionnaire, when completed, shall provide
all information and material required by the CAS.
|
Particulars
|
|
|
Ship's name:
|
|
|
IMO number:
|
|
|
Flag State:
|
|
|
Port of registry:
|
|
|
Gross tonnage:
|
|
|
Deadweight (tonnes):
|
|
|
Summer load line draught:
|
|
|
Date of delivery:
|
|
|
Category of ship:
|
|
|
Date for compliance with regulation 19:
|
|
|
Company:
|
|
|
Report identification
reference:
|
Information on access provision for close-up surveys
and thickness measurement:
The Company is requested to indicate, in the table below,
the means of access to the structures subject to close-up survey and
thickness measurement.
A Close-up survey is an examination where the
details of structural components are within the close visual inspection
range of the attending surveyor, i.e. preferably within reach of hand.
| Space
|
Temporary Staging
|
Rafts
|
Ladders
|
Direct
Access
|
Other
means (please specify)
|
| Fore Peak
|
|
|
|
|
|
| Wing tanks
|
Under
deck
|
|
|
|
|
|
| Side
shell
|
|
|
|
|
|
| Bottom
transverse
|
|
|
|
|
|
| Longitudinal
|
|
|
|
|
|
| Transverse
|
|
|
|
|
|
| Centre tanks
|
Under
deck
|
|
|
|
|
|
| Bottom
transverse
|
|
|
|
|
|
| Transverse
|
|
|
|
|
|
|
Tank Cleaning Procedures:
|
| Indicate
the frequency of the tank washing especially in way of uncoated tanks
:
|
|
|
|
|
|
|
|
|
| Washing medium used :
|
Crude oil
|
: Yes/No
|
|
|
Heated seawater
|
: Yes/No
|
|
|
Other medium (specify)
|
:
|
|
Inert Gas System installed: Yes/No
|
| Indicate average oxygen content
during inerting:
|
| Details of use of the inert case
plant:
|
|
|
|
Cargo history for the last 3 years together with indication as to whether
cargo was heated
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Ballast history for the last 3 years
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Inspections by the Company
Using a format similar to that of the table below (which
is given as an example), the Company should provide details of the
results of their inspections, for the last 3 years - in accordance
with the requirements of resolution A.744(18),
as amended, and of the CAS - on all CARGO and BALLAST tanks and VOID
spaces within the cargo area.
Spaces (include frame numbers and p or s)
|
Corrosion protection (1)
|
Coating Extent (2)
|
Coating Condition (3)
|
Structural deterioration (4)
|
Tank History (5)
|
|
Cargo Centre Tanks
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Cargo Wing Tanks
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Slop
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Ballast tanks
|
|
|
|
|
|
| Aft peak
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Fore peak
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Miscellaneous spaces:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| * Indicate tanks which
are used for oil/ballast
|
|
|
|
|
| 1) HC = hard coating; SC = soft coating; A =
anodes; NP = no protection
|
|
Company:
.................................................................
|
| 2) U = upper part; M = middle part; L = lower
part; C = complete
|
|
Name/Signature:
.......................................................
|
| 3) G = good; F = fair; P = poor, RC =
recoated
|
|
Date:
.........................................................................
|
4) N = no findings recorded Y =
findings recorded, description of findings is to be attached to the
questionnaire
|
|
|
5) DR = Damage & Repair L =
Leakages CV = Conversion CPS = Corrosion
protection system (reports to be attached)
|
|
|
|
|
|
|
Reports of port State control inspections
| List the reports of port State
control of inspection containing hull related deficiencies and relevant
information on the deficiencies:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Safety Management System
| List non-conformities related to hull
maintenance, including the associated corrective actions:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Name of the Thickness Measurement (TM) firm