1.2.1 Plans of
boilers, having working pressures exceeding 3,4 bar and having heating
surfaces greater than 4,65 m2 are to be submitted in triplicate
for approval before construction is commenced.
1.2.2 These plans
should give full constructional features of fusion welded pressure
vessels and dimensional details of the weld preparation for longitudinal
and circumferential seams and attachments, together with particulars
of the welding consumables and of the mechanical properties of the
materials.