3.1.2 For
ships of length ≥150 m, with holds where any part of the longitudinal
bulkhead is located within B/5 or 11,5 m, whichever is less, inboard
from the ship’s side at right angles to the centreline at the
assigned summer load line, the requirements of Pt 4, Ch 7, 3 Longitudinal strength are also to be applied.