6.1.1 In
addition to the requirements for sea trials in Pt 5, Ch 1, 5.2 Sea trials, trials are to be carried
out to demonstrate that when the ship is operating 50 per cent of
the prime mover capacity and 50 per cent of the installed propulsion
systems, a speed of not less than 7 knots can be maintained with adequate
steering capability, where required by the respective class notations.
6.1.3 Where
the FMEA report has identified the need to prove the conclusions,
testing and trials are to be carried out as necessary to investigate
the following:
-
The effect of
a specific component failure.
-
The effectiveness
of automatic/manual isolation systems.
-
The behaviour
of any interlocks that may inhibit operation of essential systems.