1.1.1 The
following plans are to be submitted for consideration, together with
particulars of materials, maximum shaft powers and revolutions per
minute, see
Pt 5, Ch 1, 3.3 Power ratings.
The pressures and temperatures applicable at maximum shaft power and
under the emergency conditions of Pt 5, Ch 3, 5.2 Single screw ships are
to be stated or indicated on the plans.
- General arrangement.
- Sectional assembly.
- Rotors and couplings.
- Casings.
1.1.3 Where
rotors and castings are of welded construction, details of the welded
joints are also to be submitted for consideration.
1.1.4 In general,
plans for auxiliary turbines need not be submitted.