2.1.1 When it is
considered that, for whatever reason, any part of the hull structure
should be repaired or renewed, the Owner/Naval Authority should be
advised without delay.
2.1.2 If it is found
impracticable to deal with any such item before the ship sails, and
the Surveyor is fully satisfied that there is a sound technical justification
for postponement, in conjunction with the Owner and Naval Authority,
the maximum period for which permanent repairs may be deferred without
impairing the safety of the ship must be agreed. Deferment of permanent
repairs may require the completion of immediate temporary repairs
to the satisfaction of the Surveyor.