6.1.2 On
                                 completion, tanks and reservoirs for service and storage of system
                                 fluids are to be tested by a head of water equal to the maximum to
                                 which the tanks may be subjected, but not less than 2,5 m above the
                                 crown of the tank.
                              
                              
                              
                            
                           
                           
                           
                              
                              
                              6.1.3 After
                                 installation on board, piping systems together with associated fittings
                                 that are under internal pressure, are to be subjected to a running
                                 test at the intended maximum working pressure.
                              
                              
                              
                            
                           
                           
                           
                              
                              
                              6.1.4 Testing
                                 is to cover the following items:
                              
                              
                              
                              
                                 - 
                                    
                                    
                                    
Verification
                                       of control, alarm, safety systems.
                                    
                                    
                                    
                                  
                                 - 
                                    
                                    
                                    
Tests simulating
                                       failure of waste system equipment and pumps to verify correct functioning
                                       of alarms and systems in service.