13.2.1 The
following components are to be inspected at the manufacturer's works:
- Steering nozzle.
- Reverse bucket.
- Stator impeller.
- Integral bearing.
13.2.3 Welded
components are to comply with the requirements of Vol 1, Pt 3, Ch 3 Ship Control Systems, and be subject to stress
relief heat treatment upon completion. Where an impeller has welded
blades, non-destructive testing is to be carried out to an approved
procedure.