1.2.1 In the
                                 first instance, and before work is commenced, the Surveyors are to
                                 be satisfied that the required quality of welding is attainable with
                                 the proposed welding plant, equipment and procedures in accordance
                                 with the guidelines specified in Materials and Qualification
                                    Procedures for Ships Book A, Procedure 0-4.
                                 
                              
                              
                              
                            
                           
                           
                           
                              
                              
                              1.2.2 All
                                 welding is to be in accordance with the requirements specified in Ch  13 Requirements for Welded Construction of the Rules for the Manufacture,
                                    Testing and Certification of Materials (hereinafter referred
                                 to as the Rules for Materials).