7.2.1 The
                                 completed water jet unit is to undergo a tightness test in which an
                                 internal hydrostatic pressure of 1,5 bar above the maximum working
                                 pressure of the unit is to be applied.
                              
                              
                              
                            
                           
                           
                           
                              
                              
                              7.2.2 In cases
                                 where the impeller is fitted to the shaft using an interference fit,
                                 the bedding of the impeller with the shaft is to be demonstrated in
                                 the shop to the satisfaction of the LR Surveyor. Sufficient time is
                                 to be allowed for the temperature of the components to equalise before
                                 bedding. A contact marking between the bore of the impeller boss and
                                 the shaft surface of better than 80 per cent is to be demonstrated
                                 when the contact marking ink is spread thinly on the surface of the
                                 shaft. Alternative means for demonstrating the bedding of the impeller
                                 will be considered.
                              
                              
                              
                            
                           
                           
                           
                              
                              
                              7.2.3 Means
                                 are to be provided to indicate the relative axial position of the
                                 impeller boss on the shaft. Permanent reference marks are to be made
                                 on the impeller boss, shaft and any nut to indicate angular and axial
                                 positioning of the impeller. Care is to be taken in marking the inboard
                                 end of the shaft taper to minimise stress-raising effects.
                              
                              
                              
                            
                           
                           
                           
                              
                              
                              7.2.4 A copy
                                 of the fitting curve, relative to temperature, and means for determining
                                 any subsequent movement are to be placed on board.
                              
                              
                              
                            
                           
                           
                           
                              
                              
                              7.2.5 The
                                 impeller running clearances are to be checked following the installation
                                 of the unit in the ship.
                              
                              
                              
                            
                           
                           
                           
                              
                              
                              7.2.6 The
                                 thrust bearing clearances in the water jet system are to be verified
                                 against the required design values. This is to be done following the
                                 installation of the unit in the ship.
                              
                              
                              
                            
                           
                           
                           
                              
                              
                              7.2.7 The
                                 piping systems are to be adequately flushed in accordance with the
                                 manufacturer’s recommendations and the final levels of contamination
                                 recorded. Similarly, pressure testing of the piping systems is to