1.1.2 Unless
                                 otherwise advised, it is the responsibility of the Builder as main
                                 contractor to ensure, in co-operation with the Enginebuilders, that
                                 the information required by this Chapter is prepared and submitted.
                              
                              
                              
                            
                           
                           
                           
                              
                              
                              1.1.3 The requirements of this Chapter are applicable to main propulsion systems
                                 formed by engines, turbines or electric motors, directly driven or geared to the
                                 shafting.