11.1.1 Arrangements
for the transfer of personnel are to be in accordance with a specified
standard.
11.1.2 Unless
specified, only manually powered equipment is to be installed for
the transfer of personnel.
11.1.3 The
design of arrangements for personnel is to provide sufficient space
for the large numbers of crew normally required to operate the transfer
equipment, typically 25 personnel to tension the rig on a receiving
ship.
11.1.4 The
mechanical devices used in the tensioning of any rigging and the transfer
chair together with all transfer gear are to be of a proven safe design
suitable for the purpose. The arrangements are to be such that when
conducting a light jackstay transfer from a sliding pad-eye, the height
of the pad-eye can be raised/lowered to facilitate the connecting/disconnecting
process, but is to remain at a suitable fixed height during the actual
transfer.