14.1.1 RAS
systems are subject to survey through life to a schedule that has
been agreed to by LR. All systems and equipment forming part of the
RAS installation are to be identified and included in a list of surveyable
items.
14.1.2 Survey
and testing of systems and equipment are to be in accordance with Ch 9 Machinery of LR’s Code for Lifting
Appliances in a Marine Environment as applicable. Note that
enhanced design factors of safety may be required with reference to
handling and transfer of explosives and personnel, see
Vol 3, Pt 1, Ch 5, 1.3 Safety 1.3.1.(b) and Vol 3, Pt 1, Ch 5, 1.3 Safety 1.3.1.(c), and load testing will be
required, consistent with the system design requirements.