5.1.1 The acceptance criteria ensure conformity of safety and pollution prevention systems to the Provisions of Classification, see Vol 2, Pt 1, Ch 1, 2 Engineering system classification provisions of LR’s Rules and Regulations and specified Standards or Codes.
5.1.2 The route to conformance detailed in Vol 3, Pt 2, Ch 1, 6 Route to conformance provides details on the process for demonstrating that equipment and systems are acceptable to LR.
5.1.3 The acceptance criteria of safety and pollution prevention systems extend over the full lifecycle of the systems.
5.2.1 The design of safety and pollution prevention systems is to be in accordance with these Rules.
5.3.1 Safety and pollution prevention systems and their components are to be constructed in accordance with standards acceptable to LR and which satisfy the Rule requirements.
5.4.1 Safety and pollution prevention systems are to be installed in accordance with plans appraised by LR and Rule requirements to the satisfaction of LR.
5.5.1 Safety and pollution prevention systems are to be tested in accordance with a procedure agreed between LR and the designer.
5.6.1 Safety and pollution prevention systems are to be maintained through life such that the applicable Rule objectives and Provisions of Classification can be ascertained and found in a condition that is acceptable to LR.
5.7.1 Details of all modifications to safety and pollution prevention systems and equipment are to be appraised and found acceptable to LR.