5.1.1 Prior to
survey, a noise and vibration measurement plan is to be agreed by
the Owner, Builder and LR.
5.1.2 The survey
report is to comprise the data and analysis for both noise and vibration
and is to be submitted to LR for consideration.
5.1.3 The survey
report is to be prepared by the organisation undertaking the trial
measurements, which may be an approved technical organisation or LR.
5.1.4 The survey report is to be submitted to LR for evaluation and confirmation
that the results are in accordance with the noise and vibration levels specified in
these Rules and/or agreed between the Owner and Builder. The assignment of a Class
Notation or the issue of a Statement of Compliance will be subject to confirmation by an
LR specialist with a competency level of 2 or higher within Passenger and Crew
Accommodation comfort (PCAC) (ADV198).