Location
|
Inspectable/repairable?
|
Substantial consequence of failure?
|
Fatigue life factor
|
Bilge keel in
way of ballast tanks or void spaces
|
Wet
(OIWS)
|
No
(no pollution)
|
2
|
Bilge
keel
|
Wet
(OIWS)
|
Yes
(pollution)
|
4
|
LNG pump tower
attachment points (top dome penetrations and bottom base support
penetrations)
|
No
(covered by insulation)
|
Yes
(loss of primary and secondary barriers)
|
10
|
LNG pump
tower
|
Dry
|
Yes
(loss of primary and secondary barriers)
|
2
|
Bottom
longitudinal stiffener end connections inway of ballast tanks or
void spaces
|
Dry
|
No
(no pollution)
|
1
|
Bottom
longitudinal stiffener end connections
|
Dry
|
Yes
(pollution)
|
2
|
Double hull
hopper knuckle connection
|
Dry
|
No
(no pollution)
|
1
|
Stiffened
plate module supports attachment to upper deck
|
Dry
|
No
|
1
|
Lattice module
supports attachment to upper deck
|
Dry
|
Yes
|
2
|
Lattice module
supports attachment to upper deckwith single member
redundancy
|
Dry
|
No
|
1
|
Hull
structure bounding membrane LNG tanks
|
Equivalent to wet
(repair will damage insulation)
|
No
|
2
|
Penetrations
in upper deck for LNG tank domes
|
No
(covered by seal)
|
No
|
3
|